Install
$ agentstack add skill-ahmedhabiba-architor-state-manager ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
State Manager
State File: .arch/state.json
This file is the single source of truth for project progress. ALWAYS read it before responding to architecture queries. ALWAYS update it after state changes.
Reading State
- Parse the JSON file
- Check
current_phaseto know where we are - Check phase-specific status fields for detail
- For Phase 2, check
sub_phaseand individual acceptance flags (patternaccepted, componentsoverviewaccepted, crosscutting_accepted) - For Phase 3, check
componentsobject for per-component status - Check
reopens.countandreopens.maxfor reopen availability
Valid Phase Transitions
not_started → evaluation (when /analyze-prd runs)
evaluation → methodology (when Phase 1 is accepted)
methodology → components (when Phase 2 is fully accepted: pattern + components + cross-cutting)
components → finalization (when ALL components accepted)
Backward transitions are ONLY allowed via /reopen (max 2 per project).
Phase 2 Sub-Phases
pattern → components_overview → cross_cutting
Each sub-phase is accepted independently via /accept. All three must be accepted for Phase 2 to be complete.
Component Status Values
pending → in_progress (when /design-component starts)
in_progress → awaiting_acceptance (when design is presented)
awaiting_acceptance → accepted (when user accepts)
awaiting_acceptance → in_progress (when user refines)
needs-review → in_progress (after a reopen cascades)
Updating State
When updating state.json:
- Read current state
- Validate the transition is legal
- Write the updated state
- Increment
decision_countif a decision was made
Decision Log: .arch/decisions.md
Append-only file. Never edit previous entries. Format:
### [DEC-NNN] Phase X | Category
- **Decision:** [What was decided]
- **Rationale:** [Why this choice]
- **Alternatives:** [What else was considered]
- **Trade-offs:** [What was sacrificed]
- **Risk:** [Any residual risk]
- **Supersedes:** [DEC-NNN — only if this replaces a previous decision]
- **References:** [FR-NNN, DEC-NNN — only if tracing to requirements or cross-cutting decisions]
- **Date:** [ISO timestamp]
Categories: Requirements | Pattern | Technology | Integration | Security | Infrastructure | Process | Reopen
Supersedes and References are optional. Omit the line entirely when not applicable.
Supersession and Traceability Fields
Supersedes — Use when a decision replaces a previous one:
/reopencreates a new decision that supersedes the original acceptance decision for the reopened target/alternativecreates a new decision that supersedes the previous proposal's decision- Format:
**Supersedes:** DEC-003(single) or**Supersedes:** DEC-003, DEC-007(multiple) - NEVER edit the superseded entry — the new entry points backward (like RFC "Obsoletes:" fields)
References — Use when a decision traces to requirements or earlier decisions:
- Phase 3 component technology decisions should reference the FR-NNN requirements they satisfy
- Phase 3 component decisions should reference applicable DEC-NNN cross-cutting decisions from Phase 2C
- Phase 2 acceptance decisions should reference the FR-NNN requirements that drove the pattern choice
- Refinement decisions should reference the DEC-NNN of the original proposal being refined
- Format:
**References:** FR-001, FR-003, DEC-005
Example — supersession (reopen scenario):
### [DEC-012] Phase 2A | Reopen
- **Decision:** Reopened architecture pattern selection
- **Rationale:** New compliance requirement invalidates serverless approach
- **Alternatives:** Could have added compliance layer on top of existing pattern
- **Trade-offs:** Progress reset on 5 items
- **Risk:** Reopens remaining: 1 of 2
- **Supersedes:** DEC-004
- **Date:** 2026-03-11T14:00:00Z
Example — traceability (component design):
### [DEC-015] Phase 3 | Technology
- **Decision:** Selected PostgreSQL 16 for order-service data store
- **Rationale:** ACID compliance required for financial transactions; team has production experience
- **Alternatives:** MongoDB 7 (flexible schema but lacks native ACID), CockroachDB 24 (distributed but overkill)
- **Trade-offs:** Schema migrations required; less flexibility than document store
- **Risk:** Single-node bottleneck if order volume exceeds 50K TPS
- **References:** FR-003, FR-012, DEC-008, DEC-009
- **Date:** 2026-03-11T15:30:00Z
Automatic Logging Events
Log a decision entry for:
- Phase acceptance
- Phase transition
- Sub-phase acceptance (2A, 2B, 2C)
- Technology selection (per component)
- Refinement requests (what changed and why)
- Alternative requests (what was replaced)
- Review findings (significant concerns raised)
- Reopen operations (with cascade details)
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: AhmedHabiba
- Source: AhmedHabiba/architor
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.