Install
$ agentstack add skill-amanbh997-urban-design-skills-claude-cost-estimation ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
Cost Estimation Skill
This skill provides a systematic framework for estimating the capital costs of urban design projects at the masterplan and district scales. It draws on international construction cost benchmarks (Turner & Townsend, Rider Levett Bucknall, AECOM, Arcadis), infrastructure costing guides (CIRIA, ASCE), and development appraisal methodology (RICS Red Book, ULI).
All costs are provided in USD (2025 baseline) with regional adjustment factors. The goal is to enable early-stage cost estimation accurate to +/- 25-30% (AACE Class 4 estimate) sufficient for masterplan feasibility and design option comparison.
1. Building Construction Cost
1.1 Cost per m2 GFA by Building Type
Costs include structure, envelope, MEP, finishes, and contractor overhead and profit. Exclude land, professional fees, and site infrastructure (those are separate categories below).
Residential
| Type | Low | Medium | High | Premium | |------|-----|--------|------|---------| | Detached house | $800 | $1,200 | $1,800 | $2,500+ | | Townhouse / row house | $750 | $1,100 | $1,600 | $2,200+ | | Low-rise apartment (1-3 floors) | $900 | $1,300 | $1,800 | $2,400+ | | Mid-rise apartment (4-10 floors) | $1,100 | $1,600 | $2,200 | $3,000+ | | High-rise apartment (11-25 floors) | $1,400 | $2,000 | $2,800 | $4,000+ | | Super-tall apartment (25+ floors) | $2,000 | $2,800 | $4,000 | $6,000+ | | Affordable housing (basic spec) | $600 | $900 | $1,200 | N/A | | Student housing | $900 | $1,300 | $1,700 | $2,200 | | Senior housing / care home | $1,200 | $1,800 | $2,500 | $3,500 |
Commercial
| Type | Low | Medium | High | Premium | |------|-----|--------|------|---------| | Office (standard) | $1,200 | $1,800 | $2,500 | $3,500+ | | Office (Grade A / LEED Platinum) | $1,800 | $2,500 | $3,500 | $5,000+ | | Retail (shell and core) | $700 | $1,000 | $1,400 | $2,000 | | Retail (fitted out) | $1,000 | $1,500 | $2,200 | $3,500+ | | Hotel (3-star) | $1,400 | $2,000 | $2,800 | N/A | | Hotel (5-star) | $2,500 | $3,500 | $5,000 | $8,000+ | | Supermarket | $800 | $1,100 | $1,500 | $2,000 | | Food hall / market | $900 | $1,400 | $2,000 | $3,000 |
Civic / Institutional
| Type | Low | Medium | High | Premium | |------|-----|--------|------|---------| | Primary school | $1,200 | $1,800 | $2,500 | $3,500 | | Secondary school | $1,400 | $2,000 | $2,800 | $4,000 | | University building | $1,800 | $2,500 | $3,500 | $5,000 | | Healthcare clinic | $1,500 | $2,200 | $3,200 | $4,500 | | Hospital | $2,500 | $3,500 | $5,000 | $7,500 | | Community center | $1,000 | $1,500 | $2,200 | $3,000 | | Library | $1,400 | $2,000 | $3,000 | $4,500 | | Place of worship | $800 | $1,400 | $2,500 | $5,000+ | | Fire / police station | $1,200 | $1,800 | $2,500 | N/A | | Sports hall / indoor courts | $1,000 | $1,500 | $2,200 | $3,200 |
Parking
| Type | Cost per Space | Cost per m2 | |------|----------------|-------------| | Surface lot | $3,000-5,000 | $100-170 | | Structured above-grade | $20,000-35,000 | $570-1,000 | | Underground (1 level) | $35,000-50,000 | $875-1,250 | | Underground (2+ levels) | $45,000-65,000 | $1,125-1,625 | | Automated / mechanical | $30,000-60,000 | $1,500-3,000 |
1.2 Regional Cost Adjustment Factors
Apply these multipliers to the base costs above:
| Region | Factor | Notes | |--------|--------|-------| | US Northeast / California | 1.20-1.40 | High labor costs | | US Southeast / Midwest | 0.85-1.00 | Base region | | US Southwest | 0.90-1.05 | | | Western Europe (UK, France, Germany) | 1.10-1.35 | | | Northern Europe (Scandinavia) | 1.30-1.60 | High labor, weather | | Southern Europe (Spain, Italy, Greece) | 0.80-1.00 | | | Eastern Europe | 0.50-0.75 | | | GCC / Gulf States | 0.90-1.20 | Imported materials and labor | | India | 0.25-0.45 | | | China (Tier 1 cities) | 0.40-0.65 | | | Southeast Asia | 0.30-0.55 | | | Australia / New Zealand | 1.15-1.40 | | | Sub-Saharan Africa | 0.40-0.70 | Supply chain premium | | Latin America | 0.35-0.60 | | | Japan / South Korea | 1.00-1.30 | |
1.3 Height Premium
Building cost increases with height due to structural requirements, vertical transportation, and construction complexity:
| Floors | Premium over Low-Rise Base | |--------|---------------------------| | 1-3 | 1.00x (base) | | 4-6 | 1.05-1.10x | | 7-10 | 1.10-1.20x | | 11-15 | 1.15-1.30x | | 16-25 | 1.25-1.45x | | 26-40 | 1.40-1.70x | | 41-60 | 1.60-2.00x | | 60+ | 2.00-2.50x+ |
1.4 Sustainability Premium
| Certification Level | Additional Cost | |---------------------|-----------------| | Basic compliance (code minimum) | 0% (baseline) | | LEED Silver / BREEAM Good | 1-3% | | LEED Gold / BREEAM Very Good | 2-5% | | LEED Platinum / BREEAM Outstanding | 5-10% | | Net Zero Carbon | 8-15% | | Net Zero Energy | 10-20% | | Passive House standard | 5-15% | | Mass timber structure (CLT) | 0-8% (varies; sometimes cost-neutral) |
2. Infrastructure Costs
2.1 Road and Street Construction
| Element | Unit | Low | Medium | High | |---------|------|-----|--------|------| | Local street (full build) | per linear meter | $800 | $1,500 | $2,500 | | Collector street (full build) | per linear meter | $1,500 | $2,800 | $4,500 | | Arterial road (full build) | per linear meter | $3,000 | $5,500 | $9,000 | | Sidewalk (concrete, 2m wide) | per linear meter | $100 | $180 | $300 | | Protected cycle track (one-way) | per linear meter | $150 | $300 | $500 | | Protected cycle track (two-way) | per linear meter | $200 | $400 | $700 | | Asphalt resurfacing | per m2 | $15 | $30 | $50 | | Concrete paving (vehicular) | per m2 | $40 | $70 | $120 | | Unit paving (pedestrian areas) | per m2 | $60 | $120 | $250 | | Traffic signal (full intersection) | each | $80,000 | $200,000 | $400,000 | | Roundabout (single lane) | each | $200,000 | $500,000 | $1,000,000 | | Pedestrian bridge | per linear meter | $5,000 | $15,000 | $40,000 | | Vehicular bridge | per m2 deck | $2,000 | $4,000 | $8,000 |
2.2 Utilities
| Utility | Unit | Low | Medium | High | |---------|------|-----|--------|------| | Water main (150-300mm) | per linear meter | $150 | $300 | $500 | | Water main (300-600mm) | per linear meter | $300 | $600 | $1,000 | | Sewer (gravity, 200-400mm) | per linear meter | $200 | $400 | $700 | | Sewer (gravity, 400-800mm) | per linear meter | $400 | $800 | $1,400 | | Storm drain (300-600mm) | per linear meter | $150 | $350 | $600 | | Storm drain (600-1200mm) | per linear meter | $400 | $800 | $1,500 | | Pump station (water) | each | $200,000 | $500,000 | $1,500,000 | | Pump station (sewer) | each | $300,000 | $800,000 | $2,000,000 | | Water treatment (per ML/day) | each | $500,000 | $1,500,000 | $4,000,000 | | Wastewater treatment (per ML/day) | each | $800,000 | $2,500,000 | $6,000,000 | | Power distribution (underground HV) | per linear meter | $300 | $600 | $1,200 | | Power distribution (underground LV) | per linear meter | $100 | $250 | $500 | | Substation (11/33kV) | each | $200,000 | $500,000 | $1,200,000 | | Telecom duct (multi-way) | per linear meter | $50 | $120 | $250 | | District cooling pipe | per linear meter | $400 | $800 | $1,500 | | District heating pipe | per linear meter | $300 | $600 | $1,200 | | Gas main (medium pressure) | per linear meter | $100 | $250 | $450 |
2.3 Transit Infrastructure
| Element | Unit | Low | Medium | High | |---------|------|-----|--------|------| | BRT (full standard, at-grade) | per km | $5M | $15M | $30M | | LRT (at-grade) | per km | $20M | $40M | $80M | | LRT (elevated) | per km | $40M | $70M | $120M | | Metro (underground) | per km | $100M | $200M | $400M | | Metro station (underground) | each | $50M | $150M | $400M | | BRT station (median) | each | $200K | $500K | $1.5M | | LRT stop (at-grade) | each | $1M | $3M | $8M | | Bus interchange / terminal | each | $5M | $15M | $40M | | Park-and-ride (per space) | per space | $5,000 | $15,000 | $35,000 |
2.4 Green Infrastructure
| Element | Unit | Low | Medium | High | |---------|------|-----|--------|------| | Neighborhood park (basic) | per m2 | $40 | $80 | $150 | | District park (developed) | per m2 | $60 | $120 | $250 | | Urban plaza (hard landscape) | per m2 | $150 | $350 | $700 | | Waterfront promenade | per linear meter | $3,000 | $8,000 | $20,000 | | Playground (equipped) | each | $50,000 | $200,000 | $500,000 | | Sports field (natural turf) | each | $200,000 | $500,000 | $1,000,000 | | Sports field (synthetic turf) | each | $400,000 | $800,000 | $1,500,000 | | Street tree (installed, large) | each | $500 | $1,500 | $4,000 | | Bioswale / rain garden | per linear meter | $100 | $250 | $500 | | Green roof (extensive) | per m2 | $80 | $150 | $250 | | Green roof (intensive) | per m2 | $200 | $400 | $700 | | Stormwater detention basin | per m3 storage | $50 | $150 | $400 | | Underground detention tank | per m3 storage | $300 | $700 | $1,500 |
2.5 All-In Infrastructure Cost per Dwelling Equivalent
For quick estimates when detailed design is not yet available:
| Context | Infrastructure Cost per Dwelling | |---------|----------------------------------| | Greenfield (all new) | $30,000-80,000 | | Brownfield (partial reuse) | $15,000-50,000 | | Urban infill (existing network) | $8,000-25,000 | | High-density urban (shared) | $5,000-15,000 |
These include roads, utilities, open space, and community infrastructure apportioned per dwelling equivalent.
3. Soft Costs
3.1 Professional Fees
| Service | % of Construction Cost | |---------|------------------------| | Architecture | 4-8% | | Structural engineering | 1-3% | | MEP engineering | 2-4% | | Civil / infrastructure engineering | 3-6% | | Landscape architecture | 1-3% | | Urban design / masterplan | 1-3% | | Transport planning | 0.5-1.5% | | Environmental consultant | 0.5-2% | | Quantity surveyor / cost consultant | 1-2% | | Project management | 3-5% | | Planning / regulatory consultant | 0.5-1.5% | | Sustainability / LEED consultant | 0.5-1.5% |
Total professional fees: typically 15-25% of construction cost for a complex urban project. Simpler projects: 12-18%.
3.2 Other Soft Costs
| Item | % of Total Development Cost | |------|------------------------------| | Legal fees | 1-3% | | Insurance (builder's risk) | 0.5-1.5% | | Permitting and approvals | 0.5-2% | | Survey and geotechnical | 0.3-1% | | Environmental assessment (EIA) | 0.5-2% | | Marketing and sales | 2-5% (residential), 1-3% (commercial) | | Finance costs (construction loan) | 3-8% (depends on duration and rates) | | Developer overhead | 3-5% | | Contingency | 5-15% (depends on project stage) |
3.3 Contingency by Project Stage
| Stage | Recommended Contingency | |-------|------------------------| | Concept / masterplan (AACE Class 5) | 20-30% | | Schematic design (AACE Class 4) | 15-25% | | Design development (AACE Class 3) | 10-15% | | Construction documents (AACE Class 2) | 5-10% | | Tender / pre-construction (AACE Class 1) | 3-5% |
4. Total Development Cost Assembly
4.1 Cost Stack Structure
1. Land Acquisition
+ Stamp duty / transfer taxes (1-5%)
+ Legal and due diligence (0.5-1%)
2. Site Preparation
+ Demolition (if brownfield)
+ Remediation (if contaminated)
+ Earthworks and grading
+ Temporary works and site setup (2-5% of construction)
3. Infrastructure
+ Roads and streets
+ Utilities (water, sewer, storm, power, telecom)
+ Open space and landscaping
+ Transit infrastructure (if applicable)
4. Building Construction
+ Substructure (foundations)
+ Superstructure (frame, envelope)
+ MEP (mechanical, electrical, plumbing)
+ Finishes and fit-out
5. Soft Costs
+ Professional fees (15-25% of construction)
+ Permitting and approvals
+ Marketing and sales
+ Legal and insurance
6. Finance Costs
+ Construction loan interest
+ Arrangement fees
7. Developer Margin
+ Profit target: 15-20% on cost (residential)
+ Profit target: 15-25% on cost (commercial/speculative)
8. Contingency
+ As per project stage (Section 3.3)
4.2 Quick Cost Assembly (Rule of Thumb)
For rapid order-of-magnitude estimates:
Total Development Cost (excl. land) =
Building Construction Cost
x 1.15-1.25 (infrastructure and external works, 15-25% of building cost)
x 1.18-1.25 (professional fees and soft costs)
x 1.05-1.10 (finance costs)
x 1.10-1.25 (contingency)
Simplified: Building Cost x 1.55-2.00 = Total Development Cost (excl. land)
Example:
50,000 m2 mixed-use at $2,000/m2 building cost = $100M building
Total development cost = $100M x 1.75 = $175M (excl. land)
5. Revenue and Feasibility
5.1 Revenue Estimation
| Product | Revenue Basis | Typical Range | |---------|---------------|---------------| | Residential (sale) | $/m2 NIA | $2,000-15,000+ | | Residential (rent) | $/m2/month | $15-80+ | | Office (rent) | $/m2/year | $150-800+ | | Retail (rent) | $/m2/year | $200-2,000+ | | Hotel (revenue) | $/room/night (ADR) | $80-500+ | | Parking (sale) | $/space | $20,000-80,000 | | Parking (rent) | $/space/month | $100-600 |
5.2 Feasibility Quick Tests
Residual Land Value Test:
Residual Land Value = Total Revenue - Total Development Cost (excl. land)
- Developer Profit
If Residual Land Value > Land Acquisition Cost → Feasible
If Residual Land Value 15% for residential, > 20% for commercial
Yield on Cost (income-producing):
Yield on Cost = Net Operating Income (Year 1) / Total Development Cost
Target: 1-2% above prevailing cap rate
Infrastructure Ratio Check:
Infrastructure Cost / Total Development Cost
Healthy: 25% (infrastructure-heavy; consider increasing density)
5.3 Value Engineering Strategies
When costs exceed feasibility, consider these strategies in order of impact:
| Strategy | Typical Saving | Impact on Quality | |----------|---------------|-------------------| | Increase density (more units sharing infrastructure) | 10-30% per unit | Positive if well-designed | | Simplify building form (reduce facade complexity) | 5-15% | Moderate | | Standardize floor plates and unit types | 5-10% | Low | | Reduce underground parking (shift to above-grade) | $15,000-30,000 per space | Low-moderate | | Phase infrastructure (build only what's needed now) | 10-20% of infrastructure | Low | | Reduce specification level (finishes, lobby, amenities) | 5-15% | Moderate | | Switch structural system (steel to concrete or timber) | 3-10% | Low | | Prefabricate / modular construction | 5-20% | Low | | Reduce building height (avoid high-rise premium) | 5-25% | Context-dependent | | Shared parking strategy (reduce total spaces) | 10-25% of parking cost | Low |
6. Phased Development Costing
6.1 Phasing Cost Principles
- Front-loading infrastructure hurts feasibility - Each phase must generate enough revenue to fund its own infrastructure plus contribute to shared trunk infrastructure
- Catalyst investment - Budget 5-10% of total project cost for early catalyst projects (park, plaza, community facility) that establish place value
- Temporary works - Budget $500-2,000/m2 for temporary activation of undeveloped land (markets, events, pop-up retail)
- Escalation - Apply 3-5% annual escalation to construction costs for future phases
- Revenue growth - As place-making takes effect, later phases typically achieve 10-30% higher sales/rental values
6.2 Infrastructure Triggers
Plan infrastructure investment to match development triggers:
| Trigger | Infrastructure Required | Typical Cost | |---------|------------------------|--------------| | First 200 dwellings | Primary access road, water/sewer connection, temporary open space | $5-15M | | 500 dwellings | Primary school site, neighborhood park, local retail | $10-25M | | 1,000 dwellings | Secondary road network, expanded utilities, community center | $15-40M | | 2,000 dwellings | Health center, secondary school, district par
…
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: Amanbh997
- Source: Amanbh997/Urban-Design-Skills-Claude
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.