Narrating Cost Volumes

skill-danielkinneyspears-federal-proposal-skills-narrating-cost-volumes · by danielkinneyspears

Drafts the cost or price volume narrative and basis-of-estimate text for a US Federal proposal. Use when the user needs a cost volume narrative, price volume narrative, cost narrative, basis of estimate or BOE, cost-realism narrative, or to check cost-technical consistency for a federal bid. Explains and justifies proposed costs, builds the rationale for each cost element, and verifies the cost v…

No reviews yet
0 installs
13 views
0.0% view→install

Install

$ agentstack add skill-danielkinneyspears-federal-proposal-skills-narrating-cost-volumes

✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

View the full security report →

Verified badge

Passed review? Show it. Paste this badge into your README, it links to the public security report.

AgentStack Verified badge Links to your public security report.
[![AgentStack Verified](https://agentstack.voostack.com/badges/verified.svg)](https://agentstack.voostack.com/security/report/skill-danielkinneyspears-federal-proposal-skills-narrating-cost-volumes)

Reliability & compatibility

Security review passed
0 installs to date
no reviews yet
2mo ago

Declared compatibility

Claude CodeClaude Desktop

Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.

Preview Execution monitoring

We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.

How agent discovery & health will work →
Are you the author of Narrating Cost Volumes? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

Narrating Cost Volumes

Draft the cost volume narrative: the words that explain and justify the numbers. This skill writes the narrative and basis-of-estimate text around a cost model the user's pricing or finance team has built. It does not build the cost model and does not produce cost figures. Its job is to make the proposed costs understandable, credible, realistic, and consistent with the rest of the proposal.

When to use this skill

Use this skill once the pricing team has a cost estimate and the technical and management volumes are drafted, to write the cost volume narrative, the basis of estimate, and the cost-realism and reasonableness narrative, and to check that the cost volume agrees with the rest of the proposal.

It is not a pricing tool. It does not set rates, build cost models, or estimate hours — those are the pricing team's work and the subject of estimating-price-to-win on the strategy side.

Inputs

Required:

  • The cost model and figures from the user's pricing team — labor categories,

hours, rates, indirect rates, fee, ODCs, by CLIN and period.

  • The solicitation's cost volume instructions (Section L) and cost evaluation

criteria (Section M), and the Section B CLIN structure.

Preferred upstream artifacts:

  • 12-sections/: the technical and management volumes, for the

cost-technical consistency check.

  • 04-price-to-win.md: the price posture the bid is taking.
  • 10-compliance-matrix.md: the cost volume requirement rows.

Without the cost model, this skill cannot produce a cost volume. Ask the user for the pricing team's figures; do not generate cost numbers.

Read ../../shared/glossary.md, ../../shared/federal-solicitation-primer.md, and ../../shared/pursuit-workspace.md if not already read this session.

Intake

Ask these as a numbered list. Skip what the solicitation answers.

  1. The cost model. What are the proposed costs, by CLIN and period — labor

categories, hours, direct rates, indirect rates, fee, escalation, ODCs? Who on the pricing team owns them?

  1. Cost volume instructions. What does Section L require — format, CLIN

structure, supporting detail, a separate basis of estimate, cost element breakdowns, the page or file rules?

  1. Cost evaluation. How does Section M evaluate cost or price — reasonableness,

realism (cost-reimbursement), total evaluated price, options? Is this best-value or LPTA?

  1. Contract type. FFP, T&M, cost-reimbursement, or hybrid? (This governs how

much cost detail and realism narrative is needed.)

  1. Cost-technical link. Are the technical and management volumes drafted, so

the cost volume can be checked against the staffing and approach they propose?

Workflow

Cost Volume Narrative:
- [ ] Step 1: Read the cost model, Section L/M cost rules, and the volumes
- [ ] Step 2: Structure the cost volume to Section L and the CLINs
- [ ] Step 3: Draft the basis of estimate for each cost element
- [ ] Step 4: Draft the realism and reasonableness narrative
- [ ] Step 5: Run the cost-technical consistency check
- [ ] Step 6: Write the artifact (16-cost-narrative.md) and update the matrix

Step 1: Read. Read the cost model, the Section L cost instructions and Section M cost criteria, and the technical and management volumes.

Step 2: Structure. Structure the cost volume to Section L and the Section B CLIN structure, using references/cost-narrative-method.md. The narrative follows the CLINs and periods the government will evaluate.

Step 3: Basis of estimate. For each significant cost element, draft the basis of estimate — the rationale for why the number is what it is: why this many hours, this labor mix, these ODCs, this escalation rate. The BOE traces the cost to the work in the technical approach. A number with no rationale invites a realism or reasonableness challenge.

Step 4: Realism and reasonableness narrative. Draft the narrative that supports the price. For cost-reimbursement work, the realism narrative shows the proposed cost is realistic for the proposed approach (see the method file and the solicitation primer on cost-realism analysis). For all types, the reasonableness narrative supports that the price is fair. Match the depth to the contract type and Section M.

Step 5: Cost-technical consistency check. This is the step that prevents the most common and most damaging cost-volume failure. Verify the cost volume agrees with the technical and management volumes, item by item: the labor categories and staffing levels priced match those the technical volume proposes; the approach priced is the approach described; the period of performance, deliverables, travel, and materials are consistent across volumes. Any mismatch — staffing in the cost volume that differs from staffing in the technical volume — is a finding the government's evaluators will catch. Flag every inconsistency for the user and the pricing team to resolve.

Step 6: Write and update. Write 16-cost-narrative.md using templates/cost-narrative.md. Update the cost volume rows of 10-compliance-matrix.md.

Output

One artifact: 16-cost-narrative.md — the cost volume narrative and basis of estimate. Cost figures in it are the pricing team's, transcribed, not generated.

Present the user with: the drafted narrative, the cost-technical inconsistencies found (the most important output), and any cost element whose basis of estimate the pricing team still needs to supply.

References

  • references/cost-narrative-method.md: the cost volume's job, basis-of-estimate construction, the realism and reasonableness narrative, and the cost-technical consistency check.
  • templates/cost-narrative.md: the cost volume narrative artifact template.

Guardrails

  • Do not generate cost numbers. This skill narrates a cost model the pricing

team provides. It never invents rates, hours, or figures. A missing number is requested from the pricing team, never filled in.

  • Cost-technical consistency is the priority. The most damaging cost-volume

error is a cost volume that contradicts the technical volume. Check it rigorously and flag every mismatch.

  • Realism cuts both ways. Do not narrate an unrealistically low cost as a

strength; under cost-realism evaluation the government can adjust it upward.

  • Respect volume separation. Many solicitations require price to be kept out

of the technical volume entirely. Honor Section L's separation rules.

  • The BOE must trace to work. Every basis of estimate ties the cost to the

proposed approach. "Engineering judgment" with no traceable rationale is weak.

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet, be the first.

Versions

  • v0.1.0 Imported from the upstream source.