Install
$ agentstack add skill-dleerdefi-claude-code-construction-schedule-extractor ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ● Network access Used
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
Schedule Extractor
Extracts tabular schedule data embedded in drawing sheets or spec pages and outputs structured Excel files. Schedules are typically one element among many on a sheet — or the entire sheet may be a schedule.
Workflow
Extraction Progress:
- [ ] Step 1: Discover schedule locations
- [ ] Step 2: Isolate (crop) the schedule region
- [ ] Step 3: Extract structured data (pdfplumber + vision)
- [ ] Step 4: Validate and clean data
- [ ] Step 5: Output to Excel
- [ ] Step 6: Write graph entry
Step 1: Discover Schedule Locations
Use a multi-source discovery approach, checking all available sources:
Source A — Sheet titles in sheet index (primary, most reliable)
Search .construction/index/sheet_index.yaml (or the sheet index you've built) for sheets with "SCHEDULE" in the title. Many important schedules occupy an entire sheet — the sheet title tells you exactly what it is:
- "DOOR SCHEDULE" → entire sheet is a door schedule
- "FINISH SCHEDULE" or "ROOM FINISH SCHEDULE" → entire sheet is finishes
- "WINDOW SCHEDULE" → entire sheet is windows
- "PANEL SCHEDULE" → electrical panel schedule
- "FIXTURE SCHEDULE" → plumbing fixtures
For dedicated schedule sheets, the entire page is the extraction target — no need to crop.
Source B — AgentCM database query (supplementary)
If .construction/database.yaml exists, read query_command from it, then query known schedules:
# Read query_command and project_id from .construction/database.yaml
{query_command} -c "SELECT id, schedule_type, title, sheet_id, bounding_region FROM schedules WHERE project_id = '{PROJECT_ID}'"
This returns all schedules already detected (including stubs from Group Review with bounding regions). For embedded schedules on non-schedule sheets, check the bounding_region column.
Note: Schedule bounding region detection is still being refined — treat these as hints, not definitive boundaries. Always verify with vision.
Source C — Discipline-based heuristics
Schedules appear on specific sheet types:
- Door schedule → typically on A-0.XX or A-8.XX sheets, or a dedicated sheet
- Window schedule → same sheets as door schedule, or separate
- Room finish schedule → A-0.XX or interior sheets
- Panel schedule → E-X.XX electrical sheets
- Fixture schedule → P-X.XX plumbing sheets
- Equipment schedule → M-X.XX mechanical sheets
Source D — Vision scan (fallback)
If no index or graph is available:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 150 --output full_sheet.png
Use vision on the full sheet image: "Identify any tabular schedules on this drawing sheet. Report the approximate bounding box coordinates (top-left x,y and bottom-right x,y) as percentages of the image dimensions, the schedule type, and the column headers visible."
Step 2: Isolate the Schedule Region
For dedicated schedule sheets (entire page is a schedule): Skip cropping — use the full page.
For embedded schedules (schedule is one element on a larger sheet):
Crop the identified region with padding:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/crop_region.py full_sheet.png \
--box {x1},{y1},{x2},{y2} \
--padding 20 \
--output schedule_crop.png
Re-rasterize at higher DPI (300) for the cropped region to improve text clarity:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} \
--dpi 300 \
--crop {x1},{y1},{x2},{y2} \
--output schedule_hires.png
Step 3: Extract Structured Data
Use a try → validate → fallback approach:
Method A — pdfplumber table extraction (try first)
Use pdfplumber's extract_tables() method on the target page. If multiple tables are found, select the largest one (most rows with the most columns — schedules are wide). The first row of the selected table contains headers; subsequent rows are data. If no tables are found or results look garbled, fall back to vision (Method B).
Evaluate Method A — Quality Gate
Check these criteria before proceeding:
- Row count: Did pdfplumber extract at least 10 data rows? Most schedules have 20-200+ entries.
- Column consistency: Do ≥80% of rows have the same number of columns? Inconsistent columns = parsing error.
- Non-empty cells: Are >50% of cells non-empty? Mostly-empty extraction = parsing failed.
- First column validity: Does the first column contain recognizable IDs (door numbers, room numbers, equipment tags)?
Decision:
- All 4 checks pass → Method A succeeded, proceed to Step 4
- Any check fails → Method A failed, use Method B below
QUALITY GATE:
extracted_rows >= 10? YES → check next | NO → use Method B
column_consistency >= 80%? YES → check next | NO → use Method B
non_empty_cells >= 50%? YES → check next | NO → use Method B
first_col_has_valid_ids? YES → use Method A | NO → use Method B
Method B — Vision extraction (fallback)
When pdfplumber fails (common with complex layouts, merged cells, non-standard table lines):
- Rasterize the sheet at 150 DPI for overview:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 150 --output full_sheet.png
- Use vision on the full sheet image to read the schedule directly:
"This is a construction drawing sheet containing a schedule (tabular data). Extract ALL rows from the schedule as a JSON array of objects. The first row of the table contains column headers — use those as object keys. Each subsequent row is one entry. Preserve exact values including dimensions, abbreviations, and codes. If a cell is empty, use null."
- For dense schedules with small text, re-rasterize at 300 DPI and crop to just the schedule region:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/pdf/rasterize_page.py {pdf_path} {page} --dpi 300 --output schedule_hires.png
Method C — Hybrid (for maximum accuracy)
Run both methods and cross-validate:
- pdfplumber gives exact text positioning and catches every character
- Vision catches content pdfplumber misses (stamps, handwritten marks, non-standard table layouts)
- Compare row counts: if they differ by >10%, investigate the discrepancy
- Use vision results for rows that pdfplumber returned empty or garbled
Step 4: Validate and Clean
After extraction (by either method):
- Row count check: Compare extracted count against what's visually present. If off by >10%, re-extract using the other method.
- Column structure: Verify headers match expected schedule type (door schedule has MARK/SIZE/TYPE/FRAME/HARDWARE; finish schedule has RM.NO/NAME/FLOOR/BASE/WALLS/CLG)
- Merged cell cleanup: Expand merged header cells (e.g., "WALLS" spanning A/B/C/D sub-columns)
- Normalize dimensions:
3' - 0"→3'-0"(remove spaces around dashes) - Flag revisions: Note any cells within revision clouds or delta markers
- Cross-reference with database: If
.construction/database.yamlexists, readquery_commandfrom it, then verify room numbers via{query_command} -c "SELECT number FROM rooms WHERE project_id = '{PROJECT_ID}' AND number = '{room_number}'"and door numbers via{query_command} -c "SELECT tag_number FROM graph_elements WHERE element_type = 'door' AND tag_number = '{door_mark}'"
Step 5: Output to Excel
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py \
--data schedule_data.json \
--type door_schedule \
--project "Project Name" \
--sheet "A-0.01" \
--output "Door_Schedule_A-0.01.xlsx"
The script creates a formatted Excel workbook with:
- Header row with project info and source sheet
- Auto-sized columns
- Conditional formatting for empty/flagged cells
- Source metadata in a separate tab
Step 6: Ingest to Database
After Excel output, POST extracted data to the AgentCM schedule ingest API so it's stored in PostgreSQL, linked to rooms, and queryable by agents:
# Read api_url and project_id from .construction/database.yaml
curl -X POST "{api_url}/projects/{project_id}/schedules/ingest" \
-H "Content-Type: application/json" \
-d @schedule_ingest_payload.json
The ingest payload JSON follows this structure:
{
"sheetId": "",
"scheduleType": "door",
"title": "DOOR SCHEDULE",
"rowEntityType": "door",
"columns": [
{"key": "MARK", "header": "MARK"},
{"key": "WIDTH", "header": "WIDTH"},
{"key": "HEIGHT", "header": "HEIGHT"},
{"key": "TYPE", "header": "TYPE"},
{"key": "FRAME", "header": "FRAME"},
{"key": "HARDWARE_SET", "header": "HARDWARE SET"},
{"key": "FIRE_RATING", "header": "FIRE RATING"}
],
"rows": [
{
"entityIdentifier": "2.101A",
"cells": {"MARK": "2.101A", "WIDTH": "3'-0\"", "HEIGHT": "7'-0\"", "TYPE": "A", "FRAME": "HM", "HARDWARE_SET": "HW-3", "FIRE_RATING": "1 HR"}
}
],
"sourceMethod": "pdfplumber",
"confidence": 0.95
}
Schedule types and their rowEntityType:
- Door schedule →
"door"(room derived from door number: "2.101A" → Room 2.101) - Window schedule →
"window"(room derived from window mark) - Finish schedule →
"room"(entity identifier IS the room number) - Panel schedule →
"equipment" - Fixture schedule →
"fixture"(room linked spatially from plan tags)
The ingest endpoint automatically:
- Creates/updates the schedule record
- Inserts all rows with GIN-indexed jsonb cells
- Links rows to rooms (exact match, fuzzy match, or creates rooms from schedule data)
- Extracts finish/hardware codes into the code legends table
- Creates pending links for fixtures/equipment that need spatial resolution
Also write the graph finding entry (for backwards compatibility with existing skills):
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/../../scripts/graph/write_finding.py \
--type "schedule_extracted" \
--title "Door schedule extracted from A-0.01" \
--source_sheet "A-0.01" \
--output_file "Door_Schedule_A-0.01.xlsx" \
--data '{"schedule_type": "door", "row_count": 45, "columns": ["MARK","SIZE","TYPE","FRAME","HARDWARE SET"]}'
Schedule Reconciliation (Excel → DB Round-Trip)
When a PE edits an exported Excel schedule and wants changes applied back to the database:
Reconciliation Workflow
Reconciliation Progress:
- [ ] Step R1: Read metadata from edited Excel
- [ ] Step R2: Compute changeset (diff vs DB)
- [ ] Step R3: POST changeset to reconcile endpoint
- [ ] Step R4: Report summary to user
Step R1: Read Metadata from Edited Excel
Exported Excel files contain reconciliation anchors:
- Hidden
_agentcm_metasheet withschedule_id,schedule_type,sheet_id - Hidden
_row_keycolumn A with entity identifiers (door numbers, room numbers, etc.)
If the Excel lacks _agentcm_meta, it was not exported by AgentCM — treat as a fresh import (re-run the extraction workflow above).
Step R2: Compute Changeset
Run the diff engine to compare the edited Excel against current DB state:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/xlsx_to_changeset.py \
--excel "edited_schedule.xlsx" \
--query-command "$(cat .construction/database.yaml | grep query_command | cut -d'"' -f2)" \
--output changeset.json
The script:
- Reads
_agentcm_meta→ extractsschedule_id - Reads data sheet → extracts
_row_keycolumn + all data columns - Queries DB for current schedule rows/cells via psql
- Computes diff: cell changes, new rows, deleted rows, new columns, hidden columns
- Outputs a structured JSON changeset
Step R3: POST Changeset to Reconcile Endpoint
# Read api_url and project_id from .construction/database.yaml
curl -X POST "{api_url}/projects/{project_id}/schedules/reconcile" \
-H "Content-Type: application/json" \
-d @changeset.json
The reconcile endpoint applies changes with:
- Override protection: All user edits set
isUserOverride=TRUE— future re-extractions will not overwrite them - Audit trail: Every cell edit, row add/delete, and column change is logged to
schedule_change_log - Conflict detection: If a re-extraction later disagrees with a user override, a conflict is created (not silently overwritten)
Step R4: Report Summary
The endpoint returns an ExcelReconcileResult:
{
"rowsUpdated": 3,
"rowsAdded": 1,
"rowsSoftDeleted": 0,
"cellsChanged": 7,
"conflictsCreated": 0,
"columnsAdded": 0,
"columnsHidden": 0,
"errors": []
}
Report the summary to the user. If errors is non-empty, surface those for review.
Anchored Excel Export
When exporting schedules for PE review, always include reconciliation anchors:
${CLAUDE_SKILL_DIR}/../../bin/construction-python ${CLAUDE_SKILL_DIR}/scripts/schedule_to_xlsx.py \
--data schedule_data.json \
--type door_schedule \
--project "Project Name" \
--sheet "A-0.01" \
--schedule-id "{schedule_uuid}" \
--sheet-id "{sheet_uuid}" \
--output "Door_Schedule_A-0.01.xlsx"
The --schedule-id and --sheet-id flags embed metadata in the hidden _agentcm_meta sheet, enabling the round-trip reconciliation workflow.
Schedule Type Reference
| Type | Common columns | Notes | |---|---|---| | Door | Mark, Width, Height, Type, Frame, Hardware Set, Fire Rating | Cross-ref hardware sets with spec 08 71 00 | | Window | Mark, Width, Height, Type, Glazing, Frame Material | Check for energy code compliance | | Room Finish | Room #, Name, Floor, Base, North/South/East/West Walls, Ceiling | Finish codes defined in legend | | Panel | Circuit #, Description, Load (VA), Breaker Size, Phase | Verify total load vs panel capacity | | Fixture (Plumbing) | Mark, Description, Manufacturer, Model, Connection | Cross-ref with spec Division 22 | | Equipment (HVAC) | Tag, Description, CFM/BTU, Voltage, Weight | Cross-ref with spec Division 23 |
File Safety
Never overwrite an existing schedule extraction. The export script uses safe_output_path() which appends _v2, _v3, etc. automatically.
Allowed Scripts
Allowed scripts — exhaustive list. Only execute these scripts during this skill:
../../scripts/pdf/rasterize_page.py— rasterize PDF pages for vision extraction../../scripts/pdf/crop_region.py— crop schedule region from full sheet imagescripts/schedule_to_xlsx.py— Excel export with reconciliation anchorsscripts/xlsx_to_changeset.py— diff edited Excel against DB for reconciliation../../scripts/graph/write_finding.py— graph entry (Step 6)
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: dleerdefi
- Source: dleerdefi/claude-code-construction
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.