Neqsim Capex Opex Screening

skill-equinor-neqsim-community-skills-capex-opex-screening · by equinor

Educational factored CAPEX/OPEX screening that turns a bare equipment cost into a total installed CAPEX (Lang/Hand-style installation factor + contingency), an annual OPEX, and a lifecycle total cost of ownership. USE WHEN: a task needs a public, screening-level CAPEX and OPEX magnitude before detailed NeqSim CostEstimationCalculator estimating or qualified cost-engineering review.

No reviews yet
0 installs
26 views
0.0% view→install

Install

$ agentstack add skill-equinor-neqsim-community-skills-capex-opex-screening

✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

View the full security report →

Verified badge

Passed review? Show it. Paste this badge into your README, it links to the public security report.

AgentStack Verified badge Links to your public security report.
[![AgentStack Verified](https://agentstack.voostack.com/badges/verified.svg)](https://agentstack.voostack.com/security/report/skill-equinor-neqsim-community-skills-capex-opex-screening)

Reliability & compatibility

Security review passed
0 installs to date
no reviews yet
1mo ago

Declared compatibility

Claude CodeClaude Desktop

Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.

Preview Execution monitoring

We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.

How agent discovery & health will work →
Are you the author of Neqsim Capex Opex Screening? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

CAPEX/OPEX Screening

Use this skill for a quick, public screening of project cost. Given a bare equipment cost, it applies a public installation (Lang/Hand-style) factor and a contingency allowance to estimate a total installed CAPEX, then adds a simple OPEX (a fraction of CAPEX per year plus an annual energy cost) to produce a lifecycle total cost of ownership. It is intentionally simple and should guide users toward the validated NeqSim CostEstimationCalculator (Turton / Peters / Ulrich / Seider correlations with CEPCI escalation) and the NeqSim MCP runFieldEconomics workflow for real estimates.

When to Use

  • When a user wants a first-pass CAPEX and OPEX magnitude for a concept.
  • When an agent needs a cost feed for an asset-value / NPV screening chain.
  • When examples must run without confidential cost data or licensed estimating tools.

Inputs

  • bare_equipment_cost_musd: total bare (uninstalled) equipment cost in million USD.
  • installation_factor: Lang/Hand-style multiplier from bare to installed cost (default 3.5).
  • contingency_fraction: contingency added on top of installed cost (default 0.2).
  • opex_fraction_of_capex_per_year: annual OPEX as a fraction of total CAPEX (default 0.04).
  • annual_energy_use_mwh: optional annual energy use for the energy-cost term (default 0).
  • energy_price_usd_per_mwh: optional energy price (default 0).
  • project_life_years: number of years used for the lifecycle OPEX roll-up (default 20).

Outputs

  • installed_capex_musd: bare cost * installation factor.
  • total_capex_musd: installed CAPEX including contingency.
  • annual_opex_musd: OPEX-fraction term per year.
  • annual_energy_cost_musd: energy-cost term per year.
  • total_annual_opex_musd: sum of the two OPEX terms.
  • lifecycle_opex_musd: total annual OPEX times project life.
  • total_cost_of_ownership_musd: total CAPEX plus lifecycle OPEX.
  • capex_warning: ok, watch, or high (magnitude flag vs a configurable threshold).
  • neqsim_available: whether the optional NeqSim package is importable.
  • assumptions: public assumptions and required follow-up.

Engineering Method

The factored estimate uses the classic installation-factor approach: CAPEX_installed = C_equipment * f_install, then CAPEX_total = CAPEX_installed * (1 + contingency). Annual OPEX is opex_fraction * CAPEX_total + (energy_use_MWh * energy_price_USD/MWh). The lifecycle roll-up multiplies the total annual OPEX by the project life, and the total cost of ownership adds CAPEX and lifecycle OPEX. The verdict is a simple magnitude flag against a configurable CAPEX threshold.

This skill applies no CEPCI escalation, material or pressure factors, location factor, currency conversion, phasing, financing, depreciation, or abandonment cost. It is a transparent placeholder that must be replaced by a validated NeqSim cost estimate for any quantitative use.

Python Usage Pattern

from capex_opex_screening import CapexOpexModel

model = CapexOpexModel()
result = model.evaluate(
    bare_equipment_cost_musd=120.0,
    installation_factor=3.5,
    contingency_fraction=0.25,
    opex_fraction_of_capex_per_year=0.04,
    annual_energy_use_mwh=180000.0,
    energy_price_usd_per_mwh=60.0,
    project_life_years=20,
)

print(result.total_capex_musd)
print(result.total_annual_opex_musd)
print(result.total_cost_of_ownership_musd)
print(result.capex_warning)

Validated NeqSim Path

This screening is a placeholder. For real cost estimates use:

  • NeqSim CostEstimationCalculator — equipment-level CAPEX with Turton / Peters /

Ulrich / Seider correlations, CEPCI escalation, material/pressure factors, and AACE class 1–5 (see the neqsim-equipment-cost-estimation skill).

  • The field-development DCF utilities in neqsim.process.util.fielddevelopment

for CAPEX/OPEX phasing and cash-flow modelling (see neqsim-field-economics).

  • The NeqSim MCP runFieldEconomics tool for an orchestrated economics evaluation.

Escalation

Escalate any watch or high verdict, and any quantitative use, to a validated NeqSim cost estimate and qualified cost-engineering review.

Validation Checklist

  • [ ] Inputs are validated and within stated ranges.
  • [ ] Examples use public data only.
  • [ ] Screening assumptions are stated explicitly.
  • [ ] Limitations are respected.
  • [ ] Quantitative use is escalated to validated NeqSim models.

Common Mistakes

| Symptom | Cause | Fix | | --- | --- | --- | | Unrealistic result | Inputs outside the screening range | Keep inputs within the stated bounds | | Misused for design | Screening output taken as final | Escalate to validated NeqSim models |

Limitations

  • Educational screening only; not a validated design method.
  • No confidential data or proprietary methods are included.
  • Escalate any quantitative or design use to validated NeqSim workflows.

References

  • NeqSim repository: https://github.com/equinor/neqsim
  • NeqSim Skills Guide: https://github.com/equinor/neqsim/blob/master/docs/integration/skills_guide.md

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet, be the first.

Versions

  • v0.1.0 Imported from the upstream source.