Install
$ agentstack add skill-hungv47-meta-skills-plan-campaign ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
IMC Plan — Orchestrator
Communication — Step 2 of 4. Coordinates specialized agents to build an integrated marketing plan — pillars, per-channel angles, content calendar, budget allocation, phased GTM timeline — from ICP research.
Core Question: "Does every angle trace to a pillar, every channel to a habitat, and every timeline slot to a real team capacity?"
> Why this skill exists, philosophy, methodology, principles, scope boundary, when NOT to use, what it pulls from elsewhere, history: [references/playbook.md](references/playbook.md) [PLAYBOOK].
Critical Gates — Read First
- Declare growth motion (PLG / SLG / Hybrid) BEFORE selecting channels. PLG favors community/SEO/forums; SLG favors paid/email/IRL/SMS.
- Evaluate ALL 9 channels (Search/AEO, Store, Bounty/Info, News, Forums, Social, IRL, Mailbox, SMS). Offline produces strategy + creative briefs.
- Pillars before angles. Orphan angles fail the anti-generic test.
- No channel assignment without habitat data from ICP research. No habitat → interview for it.
- Match cadence to declared team capacity. Over-scheduling guarantees missed deadlines.
- Stale ICP (>30 days) → recommend
research-icpre-run (soft gate). - Inherit house creative direction; never re-derive or contradict it. When
CREATIVE-DIRECTION.mdexists, the## Creative Directionsection tunes it to the campaign — it does not restate the brand world or override house movements/light/palette. Conflict or absence → soft-checkdone_with_concerns(seereferences/procedures/orchestration.md).
Quality Gate
Critic verifies (top items shown; full 11-row checklist + 4 Internal Consistency Checks + soft check live in [references/procedures/orchestration.md](references/procedures/orchestration.md)):
- [ ] Growth motion explicitly stated (PLG / SLG / Hybrid)
- [ ] 3-5 pillars, each with ICP evidence
- [ ] 3+ angles per pillar, each passing 3Q test and scored ≥15/25
- [ ] All 9 channels evaluated (selected or explicitly skipped with rationale)
- [ ] Each selected channel has ONE specific angle + execution brief
- [ ] Budget allocation present per selected channel (when budget tier declared)
- [ ] Phased timeline (3 phases) with cadence matched to team capacity
- [ ] Launch sequence follows ORB (Owned → Rented → Borrowed)
Max 2 rewrite cycles per critic verdict. Soft check: Social-media briefs ungrounded in references/platform-channels.md (or in a >90-day-stale catalog) ship done_with_concerns — never blocks.
Before Starting
Per references/_shared/before-starting-check.md [PLAYBOOK] — load context + check freshness (>30d → recommend research-icp re-run, soft gate).
| Artifact | Source | Required? | |---|---|---| | research/product-context.md | research-icp | Recommended — positioning + accuracy + unique mechanism | | research/icp-research.md | research-icp | Recommended — persona + pains + habitats + VoC + awareness | | docs/forsvn/canonical/marketing/CREATIVE-DIRECTION.md | create-brand | Recommended — house art direction; inherited into the ## Creative Direction section (soft gate — absent → that section degrades to a one-line note + done_with_concerns) | | docs/forsvn/artifacts/meta/sketches/prioritize-*.md | prioritize | Optional — strategic alignment | | docs/forsvn/experience/{product,audience,business,goals}.md | any | Optional — keys fill gaps from prior runs |
Pre-Dispatch
Canonical Pre-Dispatch (references/_shared/pre-dispatch-protocol.md [PROCEDURE]).
Needed dimensions: product, audience persona (role + size + 1-2 pains), campaign goal (90-day outcome), growth motion (drives channel weighting + budget allocation), duration + cadence, constraints (team size, budget tier, channels off-limits).
Full read order + Warm/Cold Start (5-Q) + Write-back map + Growth Motion → Channel Priority + intent-mismatch detection (defer plan-funnel for numeric targets) + --fast behavior: references/procedures/pre-dispatch.md [PROCEDURE].
Mode Resolution
Per references/_shared/mode-resolver.md [PROCEDURE] — budget: deep; --fast collapses Layer 2 sequential into single inline pass (3 pillars not 5, 2 angles/pillar, top 2-3 channels, 3-phase timeline + ORB inline, no rewrite loop). --fast does NOT skip Cold Start, Critical Gates, or artifact frontmatter contract (per marketing-skills CLAUDE.md "Safety gates supersede --fast"). Session execution profile (single-vs-multi): inherit per references/_shared/execution-policy.md.
Agents + Routing
6 sub-agents (pillar / angle / channel / timeline / launch-sequencing / critic) across Layer 1 solo → Layer 2 sequential → critic gate. Three routes — A (quick, limited ICP), B (full, ICP complete), C (called by another skill, reuses cached campaign-plan.md or runs Route B if stale).
Full agent manifest table, route pseudocode, single-agent fallback, critic gate + named-agent rewrite loop, full Quality Gate checklist + soft check: [references/procedures/orchestration.md](references/procedures/orchestration.md) [PROCEDURE].
Spawn mechanics, orchestrator-written sections (Growth Motion / Foundation / Channel Execution Briefs / offline notes), chain position, re-run triggers, skill deference: [references/procedures/dispatch-mechanics.md](references/procedures/dispatch-mechanics.md) [PROCEDURE]. Load both at Layer 1 dispatch entry.
Artifact Contract
- Path:
docs/forsvn/artifacts/marketing/campaign-plan.md(single per run; overwrite unless version preservation viacampaign-plan.v[N].md) - Lifecycle:
pipeline— re-run on ICP update / new launch / channel reallocation / growth-motion change / capacity change - Frontmatter:
skill,version,date,status,decision_state,review_tool,reviewed_at,reviewer(+ optional:campaign_name,goal,audience,growth_motion,team_size,budget_tier,duration_days) - Consumed by:
brief-landing-page,write-outreach,write-ad,optimize-seo,brief-shortform,plan-funnel— hypothesis grounding + channel-aware composition. The## Creative Directionsection (per-campaign art direction, tier 2, inheriting houseCREATIVE-DIRECTION.md) is additionally consumed by every visual brief skill (brief-graphic,brief-shortform,brief-landing-page,brief-app-preview,write-ad) by heading match — seereferences/format-conventions.md"Creative Direction section" - Cross-stack contract: schema changes require atomic update of
format-conventions.md§ "Frontmatter — required fields" + § "Body section order" — downstream jumps by heading match
Full template + per-field rules: [references/format-conventions.md](references/format-conventions.md) [PROCEDURE].
Anti-Patterns
[references/anti-patterns.md](references/anti-patterns.md) [ANTI-PATTERN]. Re-read before any plan ships. Section 1 (Strategy & Pillar) + Section 2 (Process & Dispatch) + Section 3 (Cross-Cutting marketing-stack): 5 body (channel-first / orphan angles / identical-across-channels / too-many-pillars / capacity-vs-cadence) + 4 process (angles-before-pillars / skipping-9-channel-eval / offline-without-execution-notes / ORB-violation) + 4 cross-cutting (growth-motion-undeclared / stale-ICP-silently-shipped / frontmatter-schema-drift / wrong-skill-for-intent).
Durable Rules (protected)
Completion Status
Every run ends with explicit status:
- DONE — pillars + angles + channels + timeline + launch sequence written, critic PASS
- DONEWITHCONCERNS — plan complete but with capacity-vs-cadence mismatch or thin habitat data; flagged in artifact
- BLOCKED — ICP and product context incompatible (different audiences imply different campaigns); needs user scope decision
- NEEDS_CONTEXT —
research/icp-research.mdandresearch/product-context.mdmissing; recommendresearch-icpfirst
Next Step
Run brief-landing-page for any campaign landing pages, optimize-seo for search-channel execution, write-outreach for outbound.
Worked Example
Route B end-to-end (B2B SaaS PM tool — PLG, 60 days, 500 trial signups, 4 pillars + 12 angles + 5 selected + 4 skipped + 3-phase timeline + 5-phase ORB launch + critic PASS cycle 1) + cycle-2 FAIL hypothetical + Route C snippet: [references/examples/campaign-walkthrough.md](references/examples/campaign-walkthrough.md) [EXAMPLE].
References
references/{playbook, format-conventions, anti-patterns}.md- Procedures:
references/procedures/{pre-dispatch, dispatch-mechanics, orchestration}.md[PROCEDURE] - Example:
references/examples/campaign-walkthrough.md[EXAMPLE] - Domain catalogs (loaded by agents):
references/{3d-angle-framework, channel-strategy, growth-play-patterns, platform-channels, examples}.md,references/distribution-models/clipping-and-live.md.growth-play-patterns.md[PLAYBOOK] is the durable per-channel play library (channel-agent + timeline-agent draw on it for execution-brief tactics).platform-channels.mdmaps channel-agent toreferences/_shared/platform-intelligence/(§2/§3/§6) for Social-media briefs — D13.B. - Shared:
references/_shared/{pre-dispatch-protocol, before-starting-check, mode-resolver, marketing-foundations}.md— 9-channel framework, funnel-stage vocab, 3Q test, CTA formula, VoC principles - Agents: 6 sub-agents in
agents/(see orchestration.md § Agent Manifest);critic-agent.mdholds the canonical 11-row Quality Gate Checklist marketing-skills/CLAUDE.md§"Pre-Dispatch Protocol" + §"Complexity Routing" + §"Multi-Agent Skills"
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: hungv47
- Source: hungv47/meta-skills
- License: MIT
- Homepage: https://skills.forsvn.com/
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.