Install
$ agentstack add skill-kirkruglov-claude-skills-kit-generate-project-plan ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
generate-project-plan
Language Detection
Determine the language of the user's request:
- If the request is in Russian → use templates with
-rusuffix - Otherwise → use templates with
-ensuffix
All output (headings, labels, comments, instructions) must match the detected language.
Triggers
Russian: «сформируй план проекта», «подготовь план», «составь project plan», «нужен план проекта» English: "generate project plan", "create project plan", "build plan", "prepare project plan"
1. Inputs
| Data | Required | Source | Notes | |------|:--------:|--------|-------| | Project charter (project-charter.md) | yes | knowledge or chat | Approved charter. Extract: goal, scope, dates, budget (if present), team, constraints, top-3 risks | | Duration estimates | no | chat or knowledge | Work package estimates from the user. If absent — agent estimates and marks as assumption | | Team availability data | no | chat or knowledge | Load by period, constraints (vacations, part-time). If absent — agent distributes evenly, marks as assumption | | Additional inputs | no | chat | Priorities, external dependencies, technical constraints not included in the charter |
If no charter is available — request it (system-prompt-draft.md §3 p.2):
A project plan requires an approved charter (project-charter.md).
Available data: [list what is available].
Charter status: [not started / draft / approved].
If the charter has not been created yet — start with generate-charter.
2. Execution Algorithm
- Validate inputs. Check for an approved charter. Not found → request per §1 template. Do NOT generate a plan without a charter — this breaks the dependency chain. Found → step 2.
- Extract data from the charter. Break down by category: goal, scope (included/excluded), dates (start/end), budget (if specified), team, constraints, risks. Record gaps.
- Check data for conflicts. If charter dates conflict with user-provided duration estimates — do NOT resolve independently. List discrepancies, ask which takes precedence. Exception: if the user explicitly clarifies in chat — use the clarification.
- Decompose scope into work packages (WP). Each deliverable from the charter's "Included" section → one or more WPs. Granularity: a WP is a group of related tasks with a single output. Do NOT decompose to individual tasks — that is Jira level. Assign each WP an ID (WP-001, WP-002, etc.). Group WPs by project phase. After decomposition, count total WPs: if >20 — consolidate adjacent packages within the same phase. WP count must be ≤ 20 for MVP. If consolidation would lose meaning — record as assumption and proceed to step 5.
- Set duration for each WP.
- Use user-provided estimates if available.
- If no estimates — assess based on: scope volume, resource count, comparable projects, charter constraints. Mark each such estimate as assumption.
- Unit: project ≤ 3 months → working days (wd); project > 3 months → weeks (wk). Unit must be consistent within one plan. 1 wk = 5 wd.
- Verify: sum of critical path durations (accounting for maximum parallelism) ≤ total project duration from charter. If it doesn't fit — record as issue, propose options (parallel execution / scope reduction / resource increase / date shift). Do NOT generate WP dates beyond the charter end_date. If unavoidable — mark affected WPs with
[⚠ exceeds deadline]and require a decision from the user before finalizing.
- Identify dependencies between WPs. For each related WP pair: dependency type (FS / SS / FF). FS is the default if the relationship is not explicit. Verify no circular dependencies.
- Define milestones. A milestone is a checkpoint marking the achievement of a significant result. A milestone is NOT a task — it has zero duration. It answers "what must be done by this point", not "what needs to be done". What counts as a milestone: phase completion (all WPs in phase closed); delivery of a key deliverable to the customer; external event the project depends on (approval, procurement, integration); go/no-go decision point. What does NOT count as a milestone: completion of a routine WP that is not a deliverable; internal intermediate results without external review; recurring events (weekly status, sprint reviews). Milestones from the charter (section 3) — must be included. ID: M1, M2, etc. Minimum: 3 milestones (start, mid, finish). Maximum: one per phase + key deliverables.
- Fill the resource map.
- Use availability data if provided.
- If not — take team from charter (section 5), distribute across WPs by role, treat load as uniform. Mark as assumption.
- Period columns — actual project months (not fixed).
- Read the template
project-plan-ru.md(orproject-plan-en.md) from project knowledge. - Fill the template per the rules in section 3.
- Validate the output using the checklist (section 5).
- Present the output in chat. Format (system-prompt-draft.md §3 p.4):
- What was done: "Project plan generated based on [list sources]."
- Assumptions: list all (duration estimates, resource allocation, etc.).
- Issues: if found (schedule overrun, insufficient resources).
- What is required: "Approve, provide comments, or reject."
- Do not include system paths. Use file name only: "Plan saved as project-plan.md."
- Wait for user response (system-prompt-draft.md §3 p.5).
- Approval → generate final version.
- Comments → revise, show updated version. After 3rd iteration — ask: "Continue revising or finalize the current version?"
- After approval:
- Propose text for the user to insert into log.md and project-state.md (system-prompt-draft.md §11).
- Notify: "Project plan approved. The following tasks are now available (can run in parallel): generate-risk-register (detailed risk register) and generate-comm-plan (communications plan). Which one to start?" (system-prompt-draft.md §7).
3. Section Fill Rules
Header Metadata
Version: 1.0Date: current generation date.File:project-plan.mdDocument status:draft(on generation). After approval —approved.Source: list documents used to generate the plan.
"Project Summary" Section
- Fill from the charter. Fields
Project goal,Dates,Team,Customer,PM— required. Project goal— from charter section 1 (verbatim or condensed).Dates— startdate and enddate from charter; duration — calculate.Budget— from charter section 4 (total amount). If not specified — enter: "not defined". The plan is generated without budget data. This does not block generation.Team— headcount from charter section 5.CustomerandPM— from charter sections 5/8.
"Phases and Work Packages" Section
Table is the core of the plan.
| Column | Rule | |--------|------| | ID | Unique code: WP-001, WP-002, etc. Sequential numbering | | Phase | Phase name (Initiation, Planning, Development, etc.). Group WPs by phase | | Work package | Group of related tasks with a single output. NOT an individual task — task-level detail belongs in Jira | | Owner | Role or name from charter team | | Duration | Unit selected by project duration: ≤ 3 months → working days (wd); > 3 months → weeks (wk). Consistent unit throughout the plan. Use suffix: "5 wd" or "2 wk". Calculation: 1 wk = 5 wd | | Start / End | YYYY-MM-DD. Calculate from dependencies and duration. First WP start ≥ charter startdate. Last WP end ≤ charter enddate | | Dependencies | IDs of predecessor work packages. "—" if none |
- Minimum WPs: one per deliverable from the charter.
- Maximum WPs: no more than 20 for MVP. Consolidate if exceeded.
"Milestones" Section
| Column | Rule | |--------|------| | ID | M1, M2, etc. | | Milestone | Checkpoint — event marking the achievement of a significant result. Zero duration | | Date | YYYY-MM-DD. Matches the end date of the corresponding WP or phase | | Completion criterion | Specific, verifiable condition. Format: "[artifact/result] [action] [by whom]". Example: "Prototype accepted by customer", "API deployed to staging and passed smoke tests" | | Status | On generation: not achieved. Allowed values: not achieved / achieved / overdue |
"Dependencies" Section
Table details the relationships from the WP table's Dependencies column.
| Column | Rule | |--------|------| | Source block | ID of WP that must finish/start | | Target block | ID of WP that depends on the source | | Type | FS (Finish-to-Start) — default; SS (Start-to-Start); FF (Finish-to-Finish) | | Comment | Explanation of the relationship. Required for SS and FF types |
- Verify: no circular dependencies (A→B→C→A).
- Every dependency from the WP table must appear here.
"Assumptions and Constraints" Section
- Assumptions: all agent assumptions (duration estimates, resource allocation, priorities). One item per line.
- Constraints: from charter (section 6) + identified during planning.
"Resource Map" Section
| Column | Rule | |--------|------| | Team member | Name from team roster | | Role | Role from charter | | Period columns | Project months (adapt to actual dates). Load in % of full working time | | Constraints / Notes | Vacations, part-time, outsourcing, dual roles |
- Use provided load data if available.
- If not — distribute evenly across WPs, mark as assumption.
- Total load per person per period must not exceed 100% (record as issue if exceeded).
4. Placeholder Table
> Placeholders {{}} in the template are fill-in guides, not auto-substitution variables. Replace each with the corresponding value from the inputs.
| Placeholder | Required | Source | Allowed values | |-------------|:--------:|--------|----------------| | {{project_name}} | yes | charter | text | | {{version}} | yes | agent | "1.0" on creation | | {{date}} | yes | system | YYYY-MM-DD | | {{doc_status}} | yes | agent | draft / pending approval / approved / revision | | {{source_docs}} | yes | agent | list of input documents | | {{project_goal}} | yes | charter, section 1 | text | | {{start_date}} | yes | charter, section 3 | YYYY-MM-DD | | {{end_date}} | yes | charter, section 3 | YYYY-MM-DD | | {{duration}} | yes | agent (calculate) | "N weeks" or "N months" | | {{budget}} | no | charter, section 4 | number + currency or "not defined" | | {{team_size}} | yes | charter, section 5 | number | | {{customer}} | yes | charter, sections 5/8 | name | | {{pm}} | yes | charter, sections 5/8 | name | | {{phase_name}} | yes (≥1) | agent | project phase name | | {{work_package}} | yes (≥1) | agent / scope | work package description | | {{owner}} | yes | charter / team | role or name | | {{wp_duration}} | yes | user / assumption | number + "wd" or "wk" | | {{wp_start}} | yes | agent (calculate) | YYYY-MM-DD | | {{wp_end}} | yes | agent (calculate) | YYYY-MM-DD | | {{wp_dependency}} | no | agent | WP ID or "—" | | {{milestone_name}} | yes (≥3) | charter + agent | milestone name | | {{done_criteria}} | yes | agent | completion condition: "[result] [action] [by whom]" | | {{assumption_N}} | no | agent | assumption text | | {{constraint_N}} | yes (≥1) | charter | constraint text | | {{name_N}} | no | charter / team | team member name | | {{role_N}} | no | charter / team | role | | {{load_period}} | no | data / assumption | number (% load) |
5. Validation Checklist
Before presenting the output to the user — verify:
- [ ] Charter used as primary source (no fabricated data)
- [ ] All required placeholders replaced with values
- [ ] No
{{}}placeholders remain in the text - [ ] Every deliverable from the charter is covered by at least one WP
- [ ] Dates are consistent: startdate ≤ WP dates ≤ enddate
- [ ] No circular dependencies between WPs
- [ ] Charter milestones included; milestone dates match the end of corresponding WPs/phases
- [ ] Each milestone meets the criteria from §2 p.7: marks phase completion, deliverable handoff, external event, or go/no-go. No "false milestones" (routine WP completion, recurring events)
- [ ] Completion criterion for each milestone is specific and verifiable (contains artifact/result + action + by whom)
- [ ] Sum of durations (accounting for parallelism) ≤ total project duration. If not — recorded as issue
- [ ] Duration unit is consistent throughout the plan (wd or wk) and follows the rule: ≤ 3 months → wd, > 3 months → wk
- [ ] Each resource load ≤ 100% per period (or issue is recorded)
- [ ] All agent assumptions listed in the Assumptions section
- [ ] Document status =
draft - [ ] File:
project-plan.mdlisted in the header
6. Dependencies
Consumes (input):
project-charter.md(approved) — from skillgenerate-charter- Optional: duration estimates and team availability data from the user
Produces (output): project plan → consumed by skills (system-prompt-draft.md §7):
generate-risk-register(mode: detailed) — phase 2, Planning (parallel with comm-plan)generate-comm-plan— phase 2, Planning (parallel with risk-register)generate-resource-plan— phase 2 (Product 1, not MVP)monitor-progress— phases 4–5 (Product 1)generate-plan-fact-report— phase 6coordinate-executors— phases 3, 5 (Product 1)generate-checklist— phases 5, 6 (Product 1)
After the plan is approved, the user must upload project-plan.md to project knowledge so dependent skills can access it.
7. Example Invocation
User command:
> Generate a project plan. The charter is approved and uploaded to knowledge. I don't have duration estimates for work packages — assess based on scope.
Agent response (after generation):
> Project plan "[name]" generated based on: project charter (project-charter.md). > > Assumptions: > - Duration of all work packages estimated by the agent based on scope volume and team composition. > - Team load distributed evenly (no availability data provided). > - Phase priority: Development → Testing → Launch (standard order for IT projects). > > Issues: > - [Name]'s load exceeds 100% in May (WP-005 + WP-007 in parallel). Options: shift WP-007 to June or add a resource. > > Required: approve, provide comments, or reject. > > [plan text]
Changelog
| Date | Version | Change | |------|---------|--------| | 2026-03-25 | 1.0 | Skill created. Algorithm: 14 steps. Hybrid duration estimation model. Resource map with fallback to charter data. Milestone definition criteria. Budget is optional | | 2026-03-26 | 1.1 | §2 p.4: added explicit WP counter — verify ≤20 after decomposition, consolidate adjacent packages if exceeded. §2 p.5: clarified behavior on date conflict — do NOT generate dates beyond end_date; mark affected WPs with ⚠ and require user decision | | 2026-03-29 | 1.2 | Translated to English. Added Language Detection block and bilingual triggers |
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: KirKruglov
- Source: KirKruglov/claude-skills-kit
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.