AgentStack
SKILL verified MIT Self-run

Control Plan

skill-rbraga01-quality-engineering-skills-control-plan · by RBraga01

>-

No reviews yet
0 installs
12 views
0.0% view→install

Install

$ agentstack add skill-rbraga01-quality-engineering-skills-control-plan

✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

Are you the author of Control Plan? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

Control Plan

When to use

Use this skill when:

  • Creating a new Control Plan for prototype, pre-launch, or production
  • Reviewing an existing Control Plan for completeness and accuracy
  • Updating the CP after a process change, corrective action (D7), or PFMEA update
  • Auditing a supplier's Control Plan during qualification or an IATF audit
  • Linking PFMEA controls to the Control Plan after FMEA review

Prerequisites

  • Process Flow Diagram (required — CP must mirror the process flow sequence)
  • PFMEA (required — CP controls derive from PFMEA recommended actions)
  • Drawing with ballooned characteristics and tolerance data
  • List of special and significant characteristics (SC, CC, KPC, KCC)
  • MSA results for measurement systems referenced in the CP (for production CP)

Workflow

Step 1 — Determine the CP type

| Type | When | Purpose | |------|------|---------| | Prototype | During prototype builds | Describes dimensional, material, and functional tests in prototype phase | | Pre-launch | After prototype, before PPAP | Describes controls in place during pilot/pre-production runs | | Production | After PPAP approval, at SOP | The living document — updated throughout product life |

All three types may coexist during APQP phases. The Production CP is the one submitted as PPAP Element 7.

Step 2 — Build the Control Plan structure

The CP is a table with one row per characteristic per process step. Each row contains:

Header section (document-level):

  • Control Plan number and revision
  • Part number and revision
  • Part name / description
  • Supplier / plant
  • Supplier code (OEM code)
  • Key contact / phone
  • Core team (multi-functional)
  • Date (original) and date (revised)
  • Customer engineering approval (name/date) — if required
  • Customer quality approval (name/date) — if required
  • Supplier approval (name/date)

Detail columns (one row per characteristic):

| Column | What to enter | |--------|--------------| | Part/process number | Reference number from Process Flow | | Process name / operation description | Name of the process step | | Machine, device, jig, or tool | Equipment used at this step | | Number | Characteristic number (links to balloon drawing) | | Product characteristic | Product feature being controlled (dimension, material property, appearance) | | Process characteristic | Process parameter being controlled (temperature, pressure, speed, torque) | | Special characteristic classification | SC, CC, KPC, KCC, *, ▲ per customer symbology | | Product/process specification / tolerance | Nominal value and tolerance band | | Evaluation / measurement technique | Gauge type, method, or test used | | Sample size | Number of parts per sample | | Frequency | How often samples are taken (every hour, every lot, 100%) | | Control method | How the process is controlled (SPC chart, go/no-go gauge, visual, 100% inspection) | | Reaction plan | What to do if out-of-control or out-of-specification (who, what action, containment) |

Step 3 — Populate from PFMEA

For each high-severity failure mode in the PFMEA:

  1. Identify the current prevention and detection controls from the PFMEA
  2. Transfer these controls into the corresponding CP row
  3. The reaction plan must address what happens if the control detects a non-conformance

Every special characteristic (SC, CC, ★, ◆) in the PFMEA must appear in the CP. Every recommended action completed in the PFMEA must be reflected in the updated CP controls.

Step 4 — Special characteristics — mandatory coverage

| Classification | OEM symbol | CP requirement | |----------------|-----------|----------------| | Safety / Regulatory | ★ SC / ⬟ | 100% inspection OR demonstrated Cpk ≥ 1.67 + statistical monitoring | | Critical Characteristic | CC / ◆ | Same as above — automatic stop if out of spec | | Significant Characteristic | SC (Ford) / KPC | Process monitoring with defined sample plan and reaction | | Key Control Characteristic | KCC | Process parameter monitoring (not product) — SPC or other control |

OEM symbol conventions vary. Always use the exact symbol specified in the customer's CSR:

  • Ford: CC (Critical Characteristic) and SC (Significant Characteristic) — do not use ★ or ◆
  • GM: ★ for safety-critical; Δ for significant
  • VW / Audi: D (design feature, = CC), E (significant characteristic), I (functional dimension) per FORMEL Q
  • BMW: G-SC (significant characteristic), G-CC (critical characteristic) per BMW standard
  • Stellantis: CC and SC per MAQMSR — requires AIAG-VDA FMEA format alignment

Using the wrong symbol for the customer's OEM is an immediate finding at PPAP and IATF audit.

For all special characteristics: the reaction plan must specify who is notified, containment action, and when the process can restart.

Step 5 — Reaction plan requirements

Every row in the CP must have a reaction plan. Minimum requirements:

  • Who is responsible for taking action
  • What immediate containment is applied (tag, sort, hold, stop production)
  • Who is notified (supervisor, quality, engineering)
  • When production may restart (after what verification)
  • Reference to relevant Work Instruction or SOP for the reaction

A reaction plan that says only "notify supervisor" or "quarantine parts" is insufficient — it must specify the next step after notification.

Step 6 — Audit an existing Control Plan

When reviewing a supplier's or internal CP, check:

Structure:

  • [ ] All process steps from the Process Flow are represented
  • [ ] Each special characteristic has its own dedicated row
  • [ ] Revision level matches the current PFMEA and drawing revision

Characteristics:

  • [ ] All SC/CC/KPC/KCC are listed with correct classification symbols
  • [ ] Product AND process characteristics are both covered (not just product)
  • [ ] Tolerances match the current released drawing

Controls:

  • [ ] Measurement technique is specific (gauge type, not just "measure")
  • [ ] Sample size and frequency are defined (not "as required" or "as needed")
  • [ ] 100% inspection is specified where Cpk "How would you like to receive the output?

> A — Structured Markdown (formatted tables and sections, ready to copy) > B — Plain tables (simplified structure for Excel or Word) > C — Narrative report (flowing text for a formal document or email) > > Default: A."

Adapt all output sections to the chosen format. If the platform or session context already defines a format preference, skip this question.

Changelog

| Version | Date | Author | Change | |---------|------|--------|--------| | 1.0 | 2026-06-06 | @RBraga01 | Initial release | | 1.1 | 2026-06-06 | @migmcc | Added OEM-specific special characteristic symbol conventions (Ford, GM, VW, BMW, Stellantis) in Step 4 |

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet — be the first.

Versions

  • v0.1.0 Imported from the upstream source.