Install
$ agentstack add skill-vigneshbarani24-sap-superpowers-delivery-factory ✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
About
SAP Delivery Factory
This skill orchestrates the production of all deliverables for an SAP Activate phase in a single coordinated run. It is not a skill — it is a factory that invokes skills, manages their inputs/outputs, tracks deliverable status, and scores quality.
What makes this different: Individual skills produce individual artifacts. The factory produces a complete, cross-referenced, quality-scored deliverable package — what a consulting firm bills $50K-$500K to create manually.
Iron Laws
- EVERY PHASE HAS A MANDATORY DELIVERABLE SET. You cannot mark a phase complete with missing deliverables. The factory knows exactly what each phase requires — no cherry-picking, no "we'll do that later."
- DELIVERABLES CHAIN — OUTPUT OF ONE IS INPUT TO THE NEXT. The project charter feeds estimation. Estimation feeds architecture. Architecture feeds development. The factory manages these dependencies automatically.
- QUALITY IS SCORED, NOT ASSUMED. Every deliverable gets a maturity score (L1-L5). The factory reports aggregate quality per phase. You ship when quality meets the threshold — not when you run out of time.
- CONTEXT FLOWS ACROSS SKILLS. Industry, country, SAP version, project scope — set once, applied everywhere. A retail project in Germany gets different templates than a pharma project in India.
- THE FACTORY NEVER PRODUCES EMPTY TEMPLATES. Templates pre-filled with project context, industry defaults, country-specific regulatory items, and SAP version-appropriate recommendations. The consultant refines — they don't start from blank.
Phase Pipelines
DISCOVER Phase
Command: /sap-deliver discover Duration: 1-2 weeks equivalent Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | D1 | Project Charter | project-kickoff | — | | D2 | Stakeholder Map & RACI | project-kickoff | — | | D3 | Requirements Document | deep-interview | — | | D4 | Risk Register (initial) | project-kickoff | — | | D5 | High-Level Scope | brainstorming | sap-architect |
Dependency chain: D1 → D2 → D3 → D4 → D5 Phase gate: All 5 deliverables at L2+ quality. Stakeholder sign-off on scope.
PREPARE Phase
Command: /sap-deliver prepare Prerequisites: DISCOVER phase complete Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | P1 | Effort Estimate (WBS) | estimation | sap-estimator | | P2 | Solution Architecture | solution-architecture | sap-architect | | P3 | Change Management Plan | change-management | — | | P4 | Business Case / ROI | value-advisory | sap-value-calculator | | P5 | Project Plan (timeline) | estimation | — |
Dependency chain: P1 ∥ P2 (parallel) → P3 → P4 → P5 Phase gate: All 5 deliverables at L3+ quality. Budget approved.
EXPLORE Phase
Command: /sap-deliver explore Prerequisites: PREPARE phase complete Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | E1 | Fit/Gap Analysis Matrix | fit-gap-analysis | Module consultants (parallel) | | E2 | Process Design Documents (per module) | process-design | sap-process-modeler | | E3 | Functional Specifications | deep-interview + module skills | sap-doc-generator | | E4 | Data Migration Strategy | data-migration | sap-data-analyst | | E5 | Test Strategy | testing-strategy | sap-test-designer | | E6 | Integration Architecture | solution-architecture | sap-architect |
Dependency chain: E1 → E2 → E3, and E4 ∥ E5 ∥ E6 (parallel) Phase gate: All gaps resolved or accepted. Functional specs signed off.
REALIZE Phase
Command: /sap-deliver realize Prerequisites: EXPLORE phase complete Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | R1 | Technical Specifications | program-to-spec or code-generation | sap-doc-generator | | R2 | Developed Objects (code) | autopilot | Full team (parallel) | | R3 | Unit Test Results | self-correcting-loop | sap-test-designer | | R4 | Code Review Reports | code-review | sap-reviewer, sap-security-auditor | | R5 | SIT Test Scripts & Results | testing-strategy | sap-test-designer | | R6 | Training Materials | module skills | sap-doc-generator |
Dependency chain: R1 → R2 → R3 → R4 → R5 ∥ R6 Phase gate: All code ATC-clean. SIT passed. Training materials reviewed.
DEPLOY Phase
Command: /sap-deliver deploy Prerequisites: REALIZE phase complete Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | Y1 | Data Migration Plan & Results | data-migration | sap-data-analyst | | Y2 | Cutover Runbook | cutover-planning | — | | Y3 | Go-Live Readiness Assessment | go-live-readiness | Full team (parallel) | | Y4 | UAT Results & Sign-Off | testing-strategy | sap-test-designer | | Y5 | Transport Release Log | transport-release | — |
Dependency chain: Y1 → Y2 → Y4 → Y3 → Y5 Phase gate: Go/No-Go decision GREEN. All transports imported.
RUN Phase
Command: /sap-deliver run Prerequisites: DEPLOY phase complete Deliverables produced:
| # | Deliverable | Skill Invoked | Agents Dispatched | |---|-------------|---------------|-------------------| | N1 | Hypercare Plan | hypercare | — | | N2 | Daily Status Reports | hypercare | — | | N3 | Value Realization Report | value-advisory | sap-value-calculator | | N4 | Lessons Learned | hypercare | — | | N5 | Knowledge Transfer Log | hypercare | sap-doc-generator |
Phase gate: Hypercare exit criteria met. Knowledge transferred.
Quality Scoring
Every deliverable is scored on a 5-level maturity model:
| Level | Name | Definition | Evidence | |-------|------|-----------|----------| | L1 | Draft | Structure created, sections identified, placeholders present | File exists with correct structure | | L2 | Working | Content filled for all sections, no placeholders remaining | All sections have substantive content | | L3 | Reviewed | Peer reviewed, gaps identified and resolved | Review comments addressed | | L4 | Approved | Client/stakeholder sign-off ready | Meets all hard gate criteria | | L5 | Baselined | Signed off, version-controlled, change-managed | Sign-off record exists |
Phase completion thresholds:
- DISCOVER: All deliverables at L2+
- PREPARE: All deliverables at L3+
- EXPLORE: All deliverables at L3+
- REALIZE: All deliverables at L4+
- DEPLOY: All deliverables at L4+
- RUN: All deliverables at L3+
Context Injection
The factory injects project context into every deliverable:
PROJECT CONTEXT (set once, used everywhere)
═══════════════════════════════════════════
Client: [Client name]
Project: [Project name]
SAP Version: [From .sap-superpowers/config.json]
ABAP Release: [From config]
Industry: [Loads industry/{name}.md]
Country: [Loads country/{name}.md]
Modules: [In-scope SAP modules]
Timeline: [Project start → go-live]
Team Size: [Number of consultants]
Industry context auto-populates:
- Module-specific processes relevant to the industry
- Regulatory requirements for the country
- Common customizations for the industry
- Risk patterns typical for the industry/country combination
Factory Status Report
SAP DELIVERY FACTORY — PROJECT STATUS
═══════════════════════════════════════
Project: [Name] | Client: [Name]
Industry: [Name] | Country: [Name]
SAP: [Version] | Release: [ABAP release]
PHASE STATUS
────────────
[✅] DISCOVER — 5/5 deliverables (avg L3.2)
[✅] PREPARE — 5/5 deliverables (avg L3.8)
[🔄] EXPLORE — 3/6 deliverables (avg L2.5) ← CURRENT
[ ] REALIZE — 0/6 deliverables
[ ] DEPLOY — 0/5 deliverables
[ ] RUN — 0/5 deliverables
DELIVERABLE DETAIL (EXPLORE)
────────────────────────────
[L3 ✅] E1 Fit/Gap Matrix
[L3 ✅] E2 Process Designs (MM, SD, FI)
[L2 🔄] E3 Functional Specifications — 4/7 modules complete
[L1 ⏳] E4 Data Migration Strategy — draft started
[ ] E5 Test Strategy
[ ] E6 Integration Architecture
NEXT ACTION: Complete E3 (functional specs for PP, PM, QM)
Verification
This skill is complete when:
- [ ] All deliverables for the target phase are produced
- [ ] Each deliverable meets the phase quality threshold
- [ ] Cross-references between deliverables are consistent
- [ ] Factory status report produced
- [ ] Next phase prerequisites documented
Cross-References
- Every skill in
skills/consulting/andskills/delivery/— invoked by the factory - Every agent in
agents/— dispatched by the factory industry/files — loaded for context injectioncountry/files — loaded for regulatory contextaccelerators/— pre-built solution packages that fast-track specific phases
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: vigneshbarani24
- Source: vigneshbarani24/sap-superpowers
- License: MIT
- Homepage: https://sap-superpowers.vercel.app/
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet — be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.