AgentStack
Browse Sign in
Browse Why AgentStack Sell Docs
Sign in
SKILL verified MIT Self-run

Sap Pp

skill-boxlogodev-sapstack-sap-pp · by BoxLogoDev

>

No reviews yet
0 installs
8 views
0.0% view→install

Install

$ agentstack add skill-boxlogodev-sapstack-sap-pp

✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

View the full security report →

Verified badge

Passed review? Show it. Paste this badge into your README, it links to the public security report.

AgentStack Verified badge Links to your public security report.
[![AgentStack Verified](https://agentstack.voostack.com/badges/verified.svg)](https://agentstack.voostack.com/security/report/skill-boxlogodev-sapstack-sap-pp)

Reliability & compatibility

Security review passed
0 installs to date
no reviews yet
1mo ago

Declared compatibility

Claude CodeClaude Desktop

Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.

Preview Execution monitoring

We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.

How agent discovery & health will work →
Are you the author of Sap Pp? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

1. MRP (Material Requirements Planning)

Planning Run

  • MD01 (ECC / S/4HANA): classic MRP run → plant-level or single material
  • MD01N (S/4HANA): MRP Live → HANA-optimized, faster, recommended
  • MD02: single-item, multi-level MRP (for testing / selective re-planning)
  • MD03: single-item, single-level

MRP Types (Material Master MRP 1 view)

| Type | Description | |------|-------------| | PD | MRP — demand-driven (standard) | | VB | Manual reorder point | | VM | Automatic reorder point | | ND | No MRP | | MF | Make-to-order (individual requirements) |

Lot Sizing Procedures

| Key | Description | |-----|-------------| | EX | Lot-for-lot (exact demand quantity) | | FX | Fixed lot size | | WB | Weekly lot size | | MB | Monthly lot size | | HB | Replenishment up to maximum stock level |

Exception Messages (MD04)

| Exception | Meaning | Action | |-----------|---------|--------| | 10 | Reschedule in | Move order earlier | | 15 | Reschedule out | Push order later | | 20 | Firm planned order — reschedule | Evaluate manually | | 25 | Surplus | Cancel or reduce | | 30 | New order required | Convert planned order |


2. Production Order

Lifecycle

CO01 (Create) → Release (CO02 / KOAB batch) → Goods Issue (MIGO 261)
→ Confirmation (CO11N) → Final Confirmation → TECO (technically complete)
→ Settlement (KO88) → CLSD (closed)

Key T-codes

| T-code | Description | |--------|-------------| | CO01 | Create production order | | CO02 | Change production order | | CO03 | Display production order | | CO11N | Production order confirmation | | CO13 | Cancel confirmation | | CO24 | Missing parts list (component shortage) | | COOIS | Production order information system | | MIGO | Goods issue (261) / GR (101) for order |

Goods Issue

  • Manual: MIGO → movement type 261 → production order number
  • Backflush: CO11N → backflush checkbox → automatic at confirmation
  • Partial GI: allowed — tracks remaining requirements in MD04

Settlement

  • KO88: individual order → settlement to: cost center / G/L / material (product cost collector)
  • KO8G: collective settlement → mass processing
  • Always simulate first → check receivers and amounts before actual posting
  • Variance categories: input price / input quantity / output price / output quantity / remaining input

3. Process Orders (PP-PI)

Used in: chemical, pharmaceutical, food & beverage industries

| T-code | Description | |--------|-------------| | COR1 | Create process order | | COR2 | Change process order | | COR6N | Process order confirmation | | CORK | PI sheet (process instruction) execution | | CORZ | Process order scheduling |

Process instructions (PI sheets): define what operators enter during production Master recipe (C201): replaces routing for process industries


4. BOM Management

Key T-codes

| T-code | Description | |--------|-------------| | CS01 | Create BOM | | CS02 | Change BOM | | CS03 | Display BOM | | CS11 | BOM explosion (multi-level) | | CS14 | BOM comparison | | CS15 | Where-used list |

BOM Usages

| Usage | Description | |-------|-------------| | 1 | Production | | 2 | Engineering / design | | 3 | Universal | | 5 | Sales | | 6 | Costing |

  • Alternative BOMs: same material, multiple production methods (alt. 1, 2, 3...)
  • Selection method: MRP 4 view → BOM explosion / selection method

5. Routing and Work Centers

Work Center (CR01 / CR02)

  • Define: capacity category, available capacity, costing formulas, scheduling formulas
  • Capacity: CR11 → available capacity per shift (machine / labor)

Routing (CA01 / CA03)

  • Operations: sequence → work center → standard values (setup / machine / labor time)
  • Control key: determines: confirmation required / goods movement / costing / scheduling

Reference Operation Sets (CA11)

  • Reusable operation templates → assign to multiple routings

6. Capacity Planning

| T-code | Description | |--------|-------------| | CM01 | Capacity load overview (work center) | | CM21 | Capacity leveling (interactive) | | CM50 | Variable capacity planning | | CM99 | Scheduling overview |

  • Finite scheduling: material's MRP considers capacity constraints
  • Infinite scheduling: MRP ignores capacity → capacity leveling done separately
  • Bottleneck analysis: CM50 → identify overloaded work centers

7. Demand Management

  • MD61: planned independent requirements (make-to-stock strategy)
  • MD62: change planned independent requirements
  • Strategy group (MRP 3 view): determines how sales orders consume PIRs
  • Strategy 10: make-to-stock (no individual requirements)
  • Strategy 20: make-to-order (each order = separate production)
  • Strategy 40: planning with final assembly

8. S/4HANA PP Changes

| Feature | ECC | S/4HANA | |---------|-----|---------| | MRP run | MD01 | MD01N (MRP Live) recommended | | MRP performance | Slower (sequential) | Parallel HANA-based | | Exception handling | MD04 list | Enhanced exception management | | Scheduling board | CM21 | Production Scheduling Board (Fiori) | | Shop floor | COOIS | Manufacturing Execution Fiori apps | | eWM integration | External WM | Embedded eWM (same system) | | pMRP | Not available | Predictive MRP (AI-based exception detection) |

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet, be the first.

Versions

  • v0.1.0 Imported from the upstream source.