Install
$ agentstack add skill-chenxihuang1028-a11y-risk-management-specialist-risk-management-specialist ✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
Verified badge
Passed review? Show it. Paste this badge into your README, it links to the public security report.
Reliability & compatibility
Declared compatibility
Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.
We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.
How agent discovery & health will work →About
Risk Management Specialist
ISO 14971:2019 risk management implementation throughout the medical device lifecycle.
> Use boundary: The bundled matrix and RPN thresholds are illustrative > defaults, not values mandated by ISO 14971. A qualified risk owner must define > and approve device-specific acceptability criteria, verify control > effectiveness, and approve regulated records. The skill supports analysis and > drafting; it does not certify compliance or replace clinical, engineering, or > regulatory judgment.
Table of Contents
- [Risk Management Planning Workflow](#risk-management-planning-workflow)
- [Risk Analysis Workflow](#risk-analysis-workflow)
- [Risk Evaluation Workflow](#risk-evaluation-workflow)
- [Risk Control Workflow](#risk-control-workflow)
- [Post-Production Risk Management](#post-production-risk-management)
- [Risk Assessment Templates](#risk-assessment-templates)
- [Decision Frameworks](#decision-frameworks)
- [Tools and References](#tools-and-references)
Risk Management Planning Workflow
Establish risk management process per ISO 14971.
Workflow: Create Risk Management Plan
- Define scope of risk management activities:
- Medical device identification
- Lifecycle stages covered
- Applicable standards and regulations
- Establish risk acceptability criteria:
- Define probability categories (P1-P5)
- Define severity categories (S1-S5)
- Create risk matrix with acceptance thresholds
- Assign responsibilities:
- Risk management lead
- Subject matter experts
- Approval authorities
- Define verification activities:
- Methods for control verification
- Acceptance criteria
- Plan production and post-production activities:
- Information sources
- Review triggers
- Update procedures
- Obtain plan approval
- Establish risk management file
- Validation: Plan approved; acceptability criteria defined; responsibilities assigned; file established
Risk Management Plan Content
| Section | Content | Evidence | |---------|---------|----------| | Scope | Device and lifecycle coverage | Scope statement | | Criteria | Risk acceptability matrix | Risk matrix document | | Responsibilities | Roles and authorities | RACI chart | | Verification | Methods and acceptance | Verification plan | | Production/Post-Production | Monitoring activities | Surveillance plan |
Risk Acceptability Matrix (5x5)
| Probability \ Severity | Negligible | Minor | Serious | Critical | Catastrophic | |------------------------|------------|-------|---------|----------|--------------| | Frequent (P5) | Medium | High | High | Unacceptable | Unacceptable | | Probable (P4) | Medium | Medium | High | High | Unacceptable | | Occasional (P3) | Low | Medium | Medium | High | High | | Remote (P2) | Low | Low | Medium | Medium | High | | Improbable (P1) | Low | Low | Low | Medium | Medium |
Risk Level Actions
| Level | Acceptable | Action Required | |-------|------------|-----------------| | Low | Yes | Document and accept; still reduce as far as possible (EU MDR) | | Medium | After reduction AFAP | Reduce as far as possible; document why further reduction is impossible | | High | After reduction AFAP | Reduction required; demonstrate all further options exhausted | | Unacceptable | No | Design change mandatory |
> EU MDR — AFAP, not ALARP: For CE-marked devices, risks must be reduced as far as possible (AFAP) without economic considerations (MDR Annex I, GSPR 1–4; EN ISO 14971:2019/A11:2021 Z-annexes deviation). ALARP ("as low as reasonably practicable"), which permits cost-benefit weighing in acceptability decisions, is not an acceptable criterion under the EU MDR — a notified body will flag it. ISO 14971:2019 itself removed ALARP from the normative text. ALARP may persist in some non-EU jurisdictions (e.g., the UK HSE tradition); if used outside the EU, flag the deviation from EU requirements explicitly.
Risk Analysis Workflow
Identify hazards and estimate risks systematically.
Workflow: Conduct Risk Analysis
- Define intended use and reasonably foreseeable misuse:
- Medical indication
- Patient population
- User population
- Use environment
- Select analysis method(s):
- FMEA for component/function analysis
- FTA for system-level analysis
- HAZOP for process deviations
- Use Error Analysis for user interaction
- Identify hazards by category:
- Energy hazards (electrical, mechanical, thermal)
- Biological hazards (bioburden, biocompatibility)
- Chemical hazards (residues, leachables)
- Operational hazards (software, use errors)
- Determine hazardous situations:
- Sequence of events
- Foreseeable misuse scenarios
- Single fault conditions
- Estimate probability of harm (P1-P5)
- Estimate severity of harm (S1-S5)
- Document in hazard analysis worksheet
- Validation: All hazard categories addressed; all hazards documented; probability and severity assigned
Hazard Categories Checklist
| Category | Examples | Analyzed | |----------|----------|----------| | Electrical | Shock, burns, interference | ☐ | | Mechanical | Crushing, cutting, entrapment | ☐ | | Thermal | Burns, tissue damage | ☐ | | Radiation | Ionizing, non-ionizing | ☐ | | Biological | Infection, biocompatibility | ☐ | | Chemical | Toxicity, irritation | ☐ | | Software | Incorrect output, timing | ☐ | | Use Error | Misuse, perception, cognition | ☐ | | Environment | EMC, mechanical stress | ☐ |
Analysis Method Selection
| Situation | Recommended Method | |-----------|-------------------| | Component failures | FMEA | | System-level failure | FTA | | Process deviations | HAZOP | | User interaction | Use Error Analysis | | Software behavior | Software FMEA | | Early design phase | PHA |
Probability Criteria
| Level | Name | Description | Frequency | |-------|------|-------------|-----------| | P5 | Frequent | Expected to occur | >10⁻³ | | P4 | Probable | Likely to occur | 10⁻³ to 10⁻⁴ | | P3 | Occasional | May occur | 10⁻⁴ to 10⁻⁵ | | P2 | Remote | Unlikely | 10⁻⁵ to 10⁻⁶ | | P1 | Improbable | Very unlikely | Economic considerations (cost of further risk reduction) must not enter the EU acceptability decision (MDR Annex I GSPR 2; EN ISO 14971:2019/A11:2021). Cost may inform business decisions about whether to market the device — never whether a risk is acceptable.
Benefit-Risk Analysis Triggers
| Situation | Benefit-Risk Required | |-----------|----------------------| | Residual risk remains high | Yes | | No feasible risk reduction | Yes | | Novel device | Yes | | Unacceptable risk with clinical benefit | Yes | | All risks low | No |
Risk Control Workflow
Implement and verify risk control measures.
Workflow: Implement Risk Controls
- Identify risk control options:
- Inherent safety by design (Priority 1)
- Protective measures in device (Priority 2)
- Information for safety (Priority 3)
- Select optimal control following hierarchy
- Analyze control for new hazards introduced
- Document control in design requirements
- Implement control in design
- Develop verification protocol
- Execute verification and document results
- Evaluate residual risk with control in place
- Validation: Control implemented; verification passed; residual risk acceptable; no unaddressed new hazards
Risk Control Hierarchy
| Priority | Control Type | Examples | Effectiveness | |----------|--------------|----------|---------------| | 1 | Inherent Safety | Eliminate hazard, fail-safe design | Highest | | 2 | Protective Measures | Guards, alarms, automatic shutdown | High | | 3 | Information | Warnings, training, IFU | Lower |
Risk Control Option Analysis Template
RISK CONTROL OPTION ANALYSIS
Hazard ID: H-[XXX]
Hazard: [Description]
Initial Risk: P[X] × S[X] = [Level]
OPTIONS CONSIDERED:
| Option | Control Type | New Hazards | Feasibility | Selected |
|--------|--------------|-------------|-------------|----------|
| 1 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
| 2 | [Type] | [Yes/No] | [H/M/L] | [Yes/No] |
SELECTED CONTROL: Option [X]
Rationale: [Justification for selection]
IMPLEMENTATION:
- Requirement: [REQ-XXX]
- Design Document: [Reference]
VERIFICATION:
- Method: [Test/Analysis/Review]
- Protocol: [Reference]
- Acceptance Criteria: [Criteria]
Risk Control Verification Methods
| Method | When to Use | Evidence | |--------|-------------|----------| | Test | Quantifiable performance | Test report | | Inspection | Physical presence | Inspection record | | Analysis | Design calculation | Analysis report | | Review | Documentation check | Review record |
Residual Risk Evaluation
| After Control | Action | |---------------|--------| | Acceptable | Document, proceed | | Reduced AFAP | Document rationale (no economic considerations), proceed | | Still unacceptable | Additional control or design change | | New hazard introduced | Analyze and control new hazard |
Post-Production Risk Management
Monitor and update risk management throughout product lifecycle.
Workflow: Post-Production Risk Monitoring
- Identify information sources:
- Customer complaints
- Service reports
- Vigilance/adverse events
- Literature monitoring
- Clinical studies
- Establish collection procedures
- Define review triggers:
- New hazard identified
- Increased frequency of known hazard
- Serious incident
- Regulatory feedback
- Analyze incoming information for risk relevance
- Update risk management file as needed
- Communicate significant findings
- Conduct periodic risk management review
- Validation: Information sources monitored; file current; reviews completed per schedule
Information Sources
| Source | Information Type | Review Frequency | |--------|------------------|------------------| | Complaints | Use issues, failures | Continuous | | Service | Field failures, repairs | Monthly | | Vigilance | Serious incidents | Immediate | | Literature | Similar device issues | Quarterly | | Regulatory | Authority feedback | As received | | Clinical | PMCF data | Per plan |
Risk Management File Update Triggers
| Trigger | Response Time | Action | |---------|---------------|--------| | Serious incident | Immediate | Full risk review | | New hazard identified | 30 days | Risk analysis update | | Trend increase | 60 days | Trend analysis | | Design change | Before implementation | Impact assessment | | Standards update | Per transition period | Gap analysis |
Periodic Review Requirements
| Review Element | Frequency | |----------------|-----------| | Risk management file completeness | Annual | | Risk control effectiveness | Annual | | Post-market information analysis | Quarterly | | Risk-benefit conclusions | Annual or on new data |
Risk Assessment Templates
→ See references/risk-assessment-templates.md for details
Decision Frameworks
Risk Control Selection
What is the risk level?
│
├── Unacceptable ──► Can hazard be eliminated?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Eliminate Can protective
│ hazard measure reduce?
│ │
│ Yes─┴─No
│ │ │
│ ▼ ▼
│ Add Add warning
│ protection + training
│
└── High/Medium ──► Apply hierarchy
starting at Level 1
New Hazard Analysis
| Question | If Yes | If No | |----------|--------|-------| | Does control introduce new hazard? | Analyze new hazard | Proceed | | Is new risk higher than original? | Reject control option | Acceptable trade-off | | Can new hazard be controlled? | Add control | Reject control option |
Risk Acceptability Decision
| Condition | Decision | |-----------|----------| | All risks Low | Acceptable | | Medium risks reduced AFAP | Acceptable | | High risks reduced AFAP, documented | Acceptable if benefits outweigh | | Any Unacceptable residual | Not acceptable - redesign |
Tools and References
Scripts
| Tool | Purpose | Usage | |------|---------|-------| | [riskmatrixcalculator.py](scripts/riskmatrixcalculator.py) | Calculate risk levels and FMEA RPN | python risk_matrix_calculator.py --help |
Risk Matrix Calculator Features:
- Illustrative 5x5 risk matrix calculation for an ISO 14971 workflow
- FMEA RPN (Risk Priority Number) calculation
- Interactive mode for guided assessment
- Display risk criteria definitions
- JSON output for integration
Before use in a regulated file, replace or formally approve the example matrix, probability bands, severity definitions, and RPN action thresholds.
References
| Document | Content | |----------|---------| | [iso14971-implementation-guide.md](references/iso14971-implementation-guide.md) | Complete ISO 14971:2019 implementation with templates | | [risk-analysis-methods.md](references/risk-analysis-methods.md) | FMEA, FTA, HAZOP, Use Error Analysis methods |
Quick Reference: ISO 14971 Process
| Stage | Key Activities | Output | |-------|----------------|--------| | Planning | Define scope, criteria, responsibilities | Risk Management Plan | | Analysis | Identify hazards, estimate risk | Hazard Analysis | | Evaluation | Compare to criteria, AFAP assessment (EU) | Risk Evaluation | | Control | Implement hierarchy, verify | Risk Control Records | | Residual | Overall assessment, benefit-risk | Risk Management Report | | Production | Monitor, review, update | Updated RM File |
Related Skills
| Skill | Integration Point | |-------|-------------------| | quality-manager-qms-iso13485 | QMS integration | | capa-officer | Risk-based CAPA | | regulatory-affairs-head | Regulatory submissions | | quality-documentation-manager | Risk file management |
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: chenxihuang1028-a11y
- Source: chenxihuang1028-a11y/risk-management-specialist
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet, be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.