Install
$ agentstack add skill-jody09-dotcom-constructionx-skills-cdm-2015-check ✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
Verified badge
Passed review? Show it. Paste this badge into your README, it links to the public security report.
Reliability & compatibility
Declared compatibility
Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.
We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.
How agent discovery & health will work →About
CDM 2015 Check
This skill produces a one-page CDM 2015 brief for a UK construction project. It checks F10 notifiability, lists the duty-holders that apply, and produces Pre-Construction Information (PCI) and Construction Phase Plan (CPP) checklists. Advisory only. HSE is the authoritative source. For formal compliance, engage a qualified CDM coordinator or chartered construction professional.
When to Use
- New project scoping, before tender or contract signing
- Tender stage, checking what the client must provide
- Due-diligence review on a project you are about to take on
- Client education, explaining CDM duties to a commercial or domestic client
- Checking F10 notifiability for a project you are mid-way through planning
Workflow
Phase 1, ask project facts.
- Project description and scope
- Duration in working days (elapsed)
- Peak workforce on site at any one time
- Client type: commercial, public sector, domestic (i.e. private householder for their own dwelling)
- Is there more than one contractor on site (including subbies)? Yes/No
- Location and environmental factors (live building, public nearby, rail/road adjacency)
Phase 2, apply F10 notifiability test.
Under CDM 2015 Regulation 6, a project is notifiable to HSE via Form F10 if either:
- It is expected to last longer than 30 working days AND have more than 20 workers working simultaneously at any point, OR
- It is expected to exceed 500 person-days.
If either threshold is met, F10 notification is required. The client is the duty-holder for submitting the F10, but in practice the Principal Designer or Principal Contractor often prepares it.
Reference references/cdm-2015-duty-holders.md for the exact HSE wording and guidance.
Phase 3, list duty-holders.
Apply the CDM 2015 roles:
- Client (always). Domestic clients: their duties pass to the contractor (single-contractor) or Principal Contractor (multi-contractor). Commercial clients: full duties apply.
- Principal Designer. Required when more than one contractor is on site. Appointed in writing by the client.
- Principal Contractor. Required when more than one contractor is on site. Appointed in writing by the client.
- Designers. Anyone preparing or modifying a design, including temporary works designers and specifier-subcontractors.
- Contractors. Anyone managing or carrying out construction work.
- Workers. Operatives on site.
For domestic clients, note the pass-through: duties do not disappear, they move to PD/PC or sole contractor.
Phase 4, produce PCI and CPP checklists.
Pre-Construction Information (PCI): what the client provides to designers and contractors before work starts. Construction Phase Plan (CPP): what the Principal Contractor (or sole contractor) produces before work starts on site.
Phase 5, present result.
Use the output template below. Single-page brief. Short sentences.
Output Template
# CDM 2015 Project Brief
**Project:** {name}
**Client type:** {Commercial / Public sector / Domestic}
**Duration (working days):** {n}
**Peak workforce:** {n}
**More than one contractor:** {Yes / No}
**Prepared:** {YYYY-MM-DD}
## F10 Notifiable?
{Yes / No}
Reason: {Threshold calculation, e.g. "Duration 45 working days with peak 24 workers on site, exceeds the 30-day AND 20-workers test. F10 required."}
## Duty-Holders
| Role | Who | Key duties (summary) |
|------|-----|----------------------|
| Client | {name} | Provide PCI. Appoint PD and PC in writing. Ensure adequate time and resource. |
| Principal Designer | {name / "not required, single contractor"} | Plan, manage, coordinate H&S in pre-construction phase. Prepare PCI. |
| Principal Contractor | {name / "not required, single contractor"} | Plan, manage, coordinate H&S in construction phase. Produce CPP. |
| Designers | {list} | Design to eliminate/reduce risk. Provide information on residual risks. |
| Contractors | {list} | Plan, manage, monitor their own work. Produce RAMS. |
| Workers | n/a | Take care of own safety. Report risks. Cooperate. |
## Pre-Construction Information (PCI) Checklist
- [ ] Project description, scope, and programme
- [ ] Client's considerations and management requirements
- [ ] Existing site information (drawings, surveys, services)
- [ ] Asbestos survey (Refurbishment/Demolition where disturbing fabric)
- [ ] Ground conditions and contamination reports
- [ ] Structural information for the existing building (where relevant)
- [ ] Site hazards (overhead lines, buried services, adjacent occupants, restricted access)
- [ ] Welfare requirements
- [ ] Programme and key dates
- [ ] Procurement route and contractor list (where known)
- [ ] Design risk register from the design team
- [ ] Information for the CPP
## Construction Phase Plan (CPP) Checklist
- [ ] Description of the project and programme
- [ ] Management arrangements and responsibilities
- [ ] Key dates and phasing
- [ ] Arrangements for managing the significant risks identified in PCI
- [ ] Site rules and induction process
- [ ] Traffic management plan
- [ ] Welfare provision (toilets, drying room, rest facility, drinking water)
- [ ] First aid and emergency arrangements
- [ ] Fire safety plan
- [ ] RAMS for high-risk works (work at height, excavations, lifting, hot works, etc.)
- [ ] Arrangements for monitoring and review
- [ ] Asbestos management plan (where applicable)
## Notes and Escalations
{Free-text notes. Items the client needs to address. Any gaps that need competent-person input.}
References
references/cdm-2015-duty-holders.md, full duty-holder table, F10 thresholds, HSE L153 pointer
Disclaimer
Advisory only. HSE is the authoritative source for CDM 2015 compliance. This brief is a starting point for discussion with a qualified CDM coordinator, chartered construction professional, or competent person. It does not replace formal appointments in writing, formal PCI, or a formal CPP. The skill does not file F10 with HSE. The client (or their appointed PD/PC acting on their behalf) is responsible for F10 submission at https://notifications.hse.gov.uk/fod/.
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: Jody09-dotcom
- Source: Jody09-dotcom/constructionx-skills
- License: MIT
- Homepage: https://constructionx.ai
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet, be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.