Check a UK construction project against CDM 2015 duty-holder requirements and determine F10 notifiability. Use when the user asks about "CDM 2015", "CDM check", "F10", "notifiable project", "duty holders", or is scoping a new project and needs the CDM picture. Outputs duty-holder roles, F10 y/n with reasoning, pre-construction info checklist, construction phase plan checklist.

No reviews yet
0 installs
8 views
0.0% view→install

Install

$ agentstack add skill-jody09-dotcom-constructionx-skills-cdm-2015-check

✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

View the full security report →

Verified badge

Passed review? Show it. Paste this badge into your README, it links to the public security report.

AgentStack Verified badge Links to your public security report.
[![AgentStack Verified](https://agentstack.voostack.com/badges/verified.svg)](https://agentstack.voostack.com/security/report/skill-jody09-dotcom-constructionx-skills-cdm-2015-check)

Reliability & compatibility

Security review passed
0 installs to date
no reviews yet
3mo ago

Declared compatibility

Claude CodeClaude Desktop

Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.

Preview Execution monitoring

We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.

How agent discovery & health will work →
Are you the author of Cdm 2015 Check? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

CDM 2015 Check

This skill produces a one-page CDM 2015 brief for a UK construction project. It checks F10 notifiability, lists the duty-holders that apply, and produces Pre-Construction Information (PCI) and Construction Phase Plan (CPP) checklists. Advisory only. HSE is the authoritative source. For formal compliance, engage a qualified CDM coordinator or chartered construction professional.

When to Use

  • New project scoping, before tender or contract signing
  • Tender stage, checking what the client must provide
  • Due-diligence review on a project you are about to take on
  • Client education, explaining CDM duties to a commercial or domestic client
  • Checking F10 notifiability for a project you are mid-way through planning

Workflow

Phase 1, ask project facts.

  • Project description and scope
  • Duration in working days (elapsed)
  • Peak workforce on site at any one time
  • Client type: commercial, public sector, domestic (i.e. private householder for their own dwelling)
  • Is there more than one contractor on site (including subbies)? Yes/No
  • Location and environmental factors (live building, public nearby, rail/road adjacency)

Phase 2, apply F10 notifiability test.

Under CDM 2015 Regulation 6, a project is notifiable to HSE via Form F10 if either:

  • It is expected to last longer than 30 working days AND have more than 20 workers working simultaneously at any point, OR
  • It is expected to exceed 500 person-days.

If either threshold is met, F10 notification is required. The client is the duty-holder for submitting the F10, but in practice the Principal Designer or Principal Contractor often prepares it.

Reference references/cdm-2015-duty-holders.md for the exact HSE wording and guidance.

Phase 3, list duty-holders.

Apply the CDM 2015 roles:

  • Client (always). Domestic clients: their duties pass to the contractor (single-contractor) or Principal Contractor (multi-contractor). Commercial clients: full duties apply.
  • Principal Designer. Required when more than one contractor is on site. Appointed in writing by the client.
  • Principal Contractor. Required when more than one contractor is on site. Appointed in writing by the client.
  • Designers. Anyone preparing or modifying a design, including temporary works designers and specifier-subcontractors.
  • Contractors. Anyone managing or carrying out construction work.
  • Workers. Operatives on site.

For domestic clients, note the pass-through: duties do not disappear, they move to PD/PC or sole contractor.

Phase 4, produce PCI and CPP checklists.

Pre-Construction Information (PCI): what the client provides to designers and contractors before work starts. Construction Phase Plan (CPP): what the Principal Contractor (or sole contractor) produces before work starts on site.

Phase 5, present result.

Use the output template below. Single-page brief. Short sentences.

Output Template

# CDM 2015 Project Brief

**Project:** {name}
**Client type:** {Commercial / Public sector / Domestic}
**Duration (working days):** {n}
**Peak workforce:** {n}
**More than one contractor:** {Yes / No}
**Prepared:** {YYYY-MM-DD}

## F10 Notifiable?

{Yes / No}

Reason: {Threshold calculation, e.g. "Duration 45 working days with peak 24 workers on site, exceeds the 30-day AND 20-workers test. F10 required."}

## Duty-Holders

| Role | Who | Key duties (summary) |
|------|-----|----------------------|
| Client | {name} | Provide PCI. Appoint PD and PC in writing. Ensure adequate time and resource. |
| Principal Designer | {name / "not required, single contractor"} | Plan, manage, coordinate H&S in pre-construction phase. Prepare PCI. |
| Principal Contractor | {name / "not required, single contractor"} | Plan, manage, coordinate H&S in construction phase. Produce CPP. |
| Designers | {list} | Design to eliminate/reduce risk. Provide information on residual risks. |
| Contractors | {list} | Plan, manage, monitor their own work. Produce RAMS. |
| Workers | n/a | Take care of own safety. Report risks. Cooperate. |

## Pre-Construction Information (PCI) Checklist

- [ ] Project description, scope, and programme
- [ ] Client's considerations and management requirements
- [ ] Existing site information (drawings, surveys, services)
- [ ] Asbestos survey (Refurbishment/Demolition where disturbing fabric)
- [ ] Ground conditions and contamination reports
- [ ] Structural information for the existing building (where relevant)
- [ ] Site hazards (overhead lines, buried services, adjacent occupants, restricted access)
- [ ] Welfare requirements
- [ ] Programme and key dates
- [ ] Procurement route and contractor list (where known)
- [ ] Design risk register from the design team
- [ ] Information for the CPP

## Construction Phase Plan (CPP) Checklist

- [ ] Description of the project and programme
- [ ] Management arrangements and responsibilities
- [ ] Key dates and phasing
- [ ] Arrangements for managing the significant risks identified in PCI
- [ ] Site rules and induction process
- [ ] Traffic management plan
- [ ] Welfare provision (toilets, drying room, rest facility, drinking water)
- [ ] First aid and emergency arrangements
- [ ] Fire safety plan
- [ ] RAMS for high-risk works (work at height, excavations, lifting, hot works, etc.)
- [ ] Arrangements for monitoring and review
- [ ] Asbestos management plan (where applicable)

## Notes and Escalations

{Free-text notes. Items the client needs to address. Any gaps that need competent-person input.}

References

  • references/cdm-2015-duty-holders.md, full duty-holder table, F10 thresholds, HSE L153 pointer

Disclaimer

Advisory only. HSE is the authoritative source for CDM 2015 compliance. This brief is a starting point for discussion with a qualified CDM coordinator, chartered construction professional, or competent person. It does not replace formal appointments in writing, formal PCI, or a formal CPP. The skill does not file F10 with HSE. The client (or their appointed PD/PC acting on their behalf) is responsible for F10 submission at https://notifications.hse.gov.uk/fod/.

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet, be the first.

Versions

  • v0.1.0 Imported from the upstream source.