AgentStack
SKILL verified MIT Self-run

Monitor Progress

skill-kirkruglov-claude-project-manager-monitor-progress · by KirKruglov

Monitors project progress across 6 operational modes: sprint progress report, deviation check (schedule vs budget), launch stream synchronization, actual data collection for project closure, weekly status report (scheduled), and daily deviation check (scheduled). Reads project-plan, project-budget, and Jira data to produce structured reports. Triggers email notifications via send-email for deviat…

No reviews yet
0 installs
14 views
0.0% view→install

Install

$ agentstack add skill-kirkruglov-claude-project-manager-monitor-progress

✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

Are you the author of Monitor Progress? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

Skill: monitor-progress

Monitors project execution across 6 modes — from sprint progress tracking to stream synchronization and final data collection. Reads Jira, project-plan, and project-budget. Generates structured reports; triggers email notifications for deviations and weekly status. Falls back gracefully when Jira is unavailable.


Triggers

Russian: «проверь прогресс», «статус проекта», «отчёт по прогрессу», «еженедельный отчёт», «проверь отклонения», «отклонения по срокам/бюджету», «синхронизация потоков», «собери фактические данные», «данные для закрытия» English: "check progress", "project status", "progress report", "weekly status", "check deviations", "deviation report", "sync streams", "collect actual data", "closing data"


Language Detection

  • Request in Russian → templates *-ru.md, all outputs in Russian
  • Otherwise → templates *-en.md, all outputs in English

Modes

| Mode | Task | Phase | Trigger type | Output | |------|------|-------|-------------|--------| | progress-report | #18 | 4 | command | progress-report-{date}.md | | deviation-check | #19 | 4 | command / schedule (daily) | deviation-report-{date}.md + email E4 | | sync-streams | #25 | 5 | command / schedule (weekly Mon, phase 5 only) | sync-report-{date}.md + email E5 | | actual-data | #28 | 6 | command | actual-data-report.xlsx (schema) | | weekly-status | Р1 | 3–5 | scheduled (Mon 9:00) | weekly-status-{date}.md + email E7 | | daily-deviation | Р2 | 3–5 | scheduled (Mon–Fri 9:00) | daily-deviation-{date}.md |


Input

| Data | Required | Source | |------|:--------:|--------| | Mode (explicit or inferred) | yes | PM in chat or scheduled task prompt | | project-state.md | yes | project root | | project-plan.md | yes (most modes) | 02-planning/ | | project-budget.xlsx | for deviation/closure | 02-planning/ | | Jira sprint data | preferred | Jira MCP (fallback: PM provides manually) | | Stream reports (sync-streams) | yes | reports/ — latest progress-report-*.md | | All Jira data (actual-data) | yes | Jira MCP (fallback: PM provides) |

Output

| File | Path | Mode | |------|------|------| | progress-report-{date}.md | reports/ | progress-report | | deviation-report-{date}.md | reports/ | deviation-check, daily-deviation | | sync-report-{date}.md | reports/ | sync-streams | | actual-data-report.xlsx | 06-closure/ | actual-data | | weekly-status-{date}.md | reports/ | weekly-status | | Email E4 (deviation deadline) | via send-email | deviation-check (level 2) | | Email E5 (stream sync) | via send-email | sync-streams (level 2) | | Email E7 (weekly status) | via send-email | weekly-status (level 1) |


Instructions

Step 1 — Determine Mode

Determine the mode from the PM's request or the scheduled task prompt.

| Cues | Mode | |------|------| | "progress", "sprint tasks", "what's done", "task status" | progress-report | | "deviations", "overdue", "behind schedule", "over budget" | deviation-check | | "stream sync", "launch streams", "dev/marketing/ops status" | sync-streams | | "actual data", "closing data", "final figures", "project closure" | actual-data | | "weekly status", "weekly report", "статус недели", "еженедельный отчёт" — or scheduled prompt contains "weekly-status" | weekly-status | | "daily check", "daily deviation", "ежедневная проверка" — or scheduled prompt contains "daily-deviation" | daily-deviation |

If mode is ambiguous and the request came from PM in chat → ask: "Which report do you need?

  1. Sprint progress — task completion status (Phase 4)
  2. Deviation check — schedule and budget deviations (Phase 4)
  3. Stream sync — dev/marketing/ops synchronization (Phase 5)
  4. Actual data — final figures for project closure (Phase 6)"

Phase validation:

  • sync-streams: only available in Phase 5. If current phase ≠ 5 → inform PM and stop.

Message: "sync-streams is only available in Phase 5 (Launch). Current phase: {PHASE}. If you need current sprint progress data, use progress-report mode instead."

  • actual-data: only available in Phase 6. If current phase ≠ 6 → inform PM and stop.

Message: "actual-data collection is only available in Phase 6 (Closure). Current phase: {PHASE}."


Step 2 — Read Project Context

Always read:

  • project-state.md → project name, current phase, sprint number, last update date

Read per mode:

| Mode | Files to read | |------|---------------| | progress-report | 02-planning/project-plan.md | | deviation-check, daily-deviation | 02-planning/project-plan.md, 02-planning/project-budget.xlsx | | sync-streams | latest reports/progress-report-*.md (last 1–2), 03-execution/launch-checklist.md | | actual-data | 02-planning/project-plan.md, 02-planning/project-budget.xlsx | | weekly-status | 02-planning/project-plan.md, latest reports/progress-report-*.md (if exists) |

If files are not found → continue with available data, note missing files in the report with placeholder [DATA NOT AVAILABLE — fill manually].


Step 3 — Query Jira (if available)

Attempt to retrieve data via Jira MCP:

| Mode | What to query | |------|--------------| | progress-report | Current sprint tasks — status, assignee, completion % | | deviation-check, daily-deviation | Overdue tasks, tasks at risk (due within 3 days) | | sync-streams | Open tasks by epic/label per stream (dev, marketing, ops) | | actual-data | All closed tasks: actual hours, completion dates, story points | | weekly-status | Sprint velocity, completed vs planned, overdue count |

Fallback if Jira MCP unavailable:

  • Continue without Jira data
  • Mark all Jira-dependent fields with the language-matched placeholder:
  • EN: [JIRA DATA UNAVAILABLE — fill manually]
  • RU: [JIRA НЕДОСТУПЕН — заполнить вручную]
  • Notify in chat (match detected language):
  • EN: "Jira MCP unavailable — report generated with placeholders. Fill in Jira sections manually."
  • RU: "Jira MCP недоступен — отчёт сгенерирован с плейсхолдерами. Заполни разделы Jira вручную."

Step 4 — Generate Report

Load the template matching mode and language:

| Mode | Template (EN) | Template (RU) | |------|--------------|---------------| | progress-report | templates/progress-report-template-en.md | templates/progress-report-template-ru.md | | deviation-check, daily-deviation | templates/deviation-report-template-en.md | templates/deviation-report-template-ru.md | | sync-streams | templates/sync-report-template-en.md | templates/sync-report-template-ru.md | | actual-data | templates/actual-data-report-schema.md | (same, bilingual schema) | | weekly-status | templates/weekly-status-template-en.md | templates/weekly-status-template-ru.md |

Populate all template sections with data from Step 2 + Step 3.

Deviation assessment rules:

  • Schedule deviation: task overdue by >0 days → flag as deviation
  • Budget deviation: actual spend > planned by >5% → flag as deviation
  • Critical threshold: >10% schedule delay or >10% budget overrun → mark as CRITICAL
  • No deviations found → for deviation-check and daily-deviation: write to logs/log.md "no deviations" and STOP (do not generate report file)

For actual-data mode:

  • Output is an xlsx schema — generate the schema structure per templates/actual-data-report-schema.md
  • Save as 06-closure/actual-data-report.xlsx (structure only; PM fills actual values from populated template or Jira export)

Step 5 — Handle Email (where applicable)

| Mode | Email template | Autonomy level | Condition | |------|---------------|---------------|-----------| | deviation-check | email-tpl-deviation-deadline-{lang}.md | 2 (draft for PM) | Deviations found | | sync-streams | email-tpl-deviation-sync-{lang}.md | 2 (draft for PM) | Desync detected | | weekly-status | email-tpl-weekly-status-{lang}.md | 1 (autonomous) | Always | | daily-deviation | — | — | None (no email) |

Level 1 (autonomous): Generate email draft → pass to send-email for immediate dispatch. Level 2 (draft): Generate email draft in reports/email-draft-{mode}-{date}.md → notify PM: "Email draft ready — review and confirm before sending via send-email."

Load the matching email template, populate with report key findings, recipients from 01-initiation/stakeholder-map.md (or comm-plan.md).


Step 6 — Save Files and Update State

  1. Save the report file to the correct path (see Output table).
  2. For actual-data mode: save 06-closure/actual-data-report.xlsx schema.
  3. Update project-state.md:
  • Add artifact record with status completed and date.
  • For weekly-status: update field last_weekly_report.
  • For deviation-check/daily-deviation: update field last_deviation_check.
  1. Write to logs/log.md:

{DATE}: monitor-progress [{MODE}] — {RESULT}. Saved: reports/{FILENAME}

  • RESULT examples: "3 deviations found", "no deviations", "report generated", "Jira unavailable — manual fill needed"
  1. Output to chat:
  • File saved path
  • Key findings summary (2–5 bullet points)
  • Email action (if applicable): "Email draft ready at reports/email-draft-{mode}-{date}.md"
  • If deviations are critical: "⚠️ CRITICAL deviation detected — immediate PM attention required."

Templates

| File | Purpose | |------|---------| | templates/progress-report-template-en.md | Sprint progress report (EN) — Task #18 | | templates/progress-report-template-ru.md | Sprint progress report (RU) — Task #18 | | templates/deviation-report-template-en.md | Deviation report (EN) — Task #19, Р2 | | templates/deviation-report-template-ru.md | Deviation report (RU) — Task #19, Р2 | | templates/weekly-status-template-en.md | Weekly status report (EN) — Р1 | | templates/weekly-status-template-ru.md | Weekly status report (RU) — Р1 | | templates/sync-report-template-en.md | Stream sync report (EN) — Task #25 | | templates/sync-report-template-ru.md | Stream sync report (RU) — Task #25 | | templates/actual-data-report-schema.md | xlsx schema for actual data collection — Task #28 | | templates/email-tpl-deviation-deadline-en.md | Email E4 — deviation notification (EN) | | templates/email-tpl-deviation-deadline-ru.md | Email E4 — deviation notification (RU) | | templates/email-tpl-deviation-sync-en.md | Email E5 — stream desync notification (EN) | | templates/email-tpl-deviation-sync-ru.md | Email E5 — stream desync notification (RU) | | templates/email-tpl-weekly-status-en.md | Email E7 — weekly status distribution (EN) | | templates/email-tpl-weekly-status-ru.md | Email E7 — weekly status distribution (RU) |


Dependencies

Reads (required):

  • project-state.md — project name, phase, sprint number
  • 02-planning/project-plan.md — planned milestones, tasks, deadlines
  • 02-planning/project-budget.xlsx — budget plan (deviation modes)

Reads (optional):

  • 01-initiation/stakeholder-map.md — email recipients
  • 02-planning/comm-plan.md — communication preferences
  • reports/progress-report-*.md — previous reports for trend comparison
  • 03-execution/launch-checklist.md — launch readiness (sync-streams)

External actions:

  • Jira MCP — sprint and task data (fallback: PM provides manually)
  • send-email skill — email dispatch (E4 level 2, E5 level 2, E7 level 1)

Writes:

  • reports/progress-report-{date}.md
  • reports/deviation-report-{date}.md
  • reports/sync-report-{date}.md
  • reports/weekly-status-{date}.md
  • reports/daily-deviation-{date}.md
  • 06-closure/actual-data-report.xlsx
  • project-state.md (status update)
  • logs/log.md (action record)

Constraints

  • sync-streams mode is only available in Phase 5
  • actual-data mode is only available in Phase 6
  • Does NOT make decisions about deviations — generates report and notifies PM
  • Does NOT update project-plan.md — PM decides how to respond to deviations
  • For deviation-check and daily-deviation: if no deviations found, logs the check and stops — no report file created
  • Fallback mode does not block report generation — produces report with placeholders
  • One invocation = one mode; do not combine modes in a single run
  • Email for weekly-status (E7, level 1) is sent autonomously — no PM confirmation required
  • Email for deviation-check (E4) and sync-streams (E5) are level 2 — PM must confirm before sending

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet — be the first.

Versions

  • v0.1.0 Imported from the upstream source.