AgentStack
SKILL verified MIT Self-run

Team Release

skill-coralgame-claude-code-game-studios-team-release · by CoralGame

Orchestrate the release team: coordinates release-manager, qa-lead, devops-engineer, and producer to execute a release from candidate to deployment.

No reviews yet
0 installs
16 views
0.0% view→install

Install

$ agentstack add skill-coralgame-claude-code-game-studios-team-release

✓ scanned · ✓ verified — works with Claude Code, Cursor, and more.

Security review

✓ Passed

No issues found. Passed automated security review. · v0.1.0 How review works →

  • Prompt-injection patterns
  • Secret / credential exfiltration
  • Dangerous shell & filesystem operations
  • Untrusted network calls
  • Known-malicious package signatures

What it can access

  • Network access No
  • Filesystem access No
  • Shell / process execution No
  • Environment & secrets No
  • Dynamic code execution No

From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.

Are you the author of Team Release? Claim this listing to set pricing, connect Stripe payouts, and keep 70% of every sale.
Sign up to claim

About

When this skill is invoked, orchestrate the release team through a structured pipeline.

Decision Points: At each phase transition, use AskUserQuestion to present the user with the subagent's proposals as selectable options. Write the agent's full analysis in conversation, then capture the decision with concise labels. The user must approve before moving to the next phase.

Team Composition

  • release-manager — Release branch, versioning, changelog, deployment
  • qa-lead — Test sign-off, regression suite, release quality gate
  • devops-engineer — Build pipeline, artifacts, deployment automation
  • producer — Go/no-go decision, stakeholder communication, scheduling

How to Delegate

Use the Task tool to spawn each team member as a subagent:

  • subagent_type: release-manager — Release branch, versioning, changelog, deployment
  • subagent_type: qa-lead — Test sign-off, regression suite, release quality gate
  • subagent_type: devops-engineer — Build pipeline, artifacts, deployment automation
  • subagent_type: producer — Go/no-go decision, stakeholder communication

Always provide full context in each agent's prompt (version number, milestone status, known issues). Launch independent agents in parallel where the pipeline allows it (e.g., Phase 3 agents can run simultaneously).

Pipeline

Phase 1: Release Planning

Delegate to producer:

  • Confirm all milestone acceptance criteria are met
  • Identify any scope items deferred from this release
  • Set the target release date and communicate to team
  • Output: release authorization with scope confirmation

Phase 2: Release Candidate

Delegate to release-manager:

  • Cut release branch from the agreed commit
  • Bump version numbers in all relevant files
  • Generate the release checklist using /release-checklist
  • Freeze the branch — no feature changes, bug fixes only
  • Output: release branch name and checklist

Phase 3: Quality Gate (parallel)

Delegate in parallel:

  • qa-lead: Execute full regression test suite. Test all critical paths. Verify no S1/S2 bugs. Sign off on quality.
  • devops-engineer: Build release artifacts for all target platforms. Verify builds are clean and reproducible. Run automated tests in CI.

Phase 4: Localization and Performance

Delegate (can run in parallel with Phase 3 if resources available):

  • Verify all strings are translated (delegate to localization-lead if available)
  • Run performance benchmarks against targets (delegate to performance-analyst if available)
  • Output: localization and performance sign-off

Phase 5: Go/No-Go

Delegate to producer:

  • Collect sign-off from: qa-lead, release-manager, devops-engineer, technical-director
  • Evaluate any open issues — are they blocking or can they ship?
  • Make the go/no-go call
  • Output: release decision with rationale

Phase 6: Deployment (if GO)

Delegate to release-manager + devops-engineer:

  • Tag the release in version control
  • Generate changelog using /changelog
  • Deploy to staging for final smoke test
  • Deploy to production
  • Monitor for 48 hours post-release

Phase 7: Post-Release

  • release-manager: Generate release report (what shipped, what was deferred, metrics)
  • producer: Update milestone tracking, communicate to stakeholders
  • qa-lead: Monitor incoming bug reports for regressions
  • Schedule post-release retrospective if issues occurred

Output

A summary report covering: release version, scope, quality gate results, go/no-go decision, deployment status, and monitoring plan.

Source & license

This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.

Install and usage instructions live in the source repository linked above.

Reviews

No reviews yet — be the first.

Versions

  • v0.1.0 Imported from the upstream source.