Install
$ agentstack add skill-codephobiia-claude-roblox-game-studio-estimate ✓ scanned · ✓ verified, works with Claude Code, Cursor, and more.
Security review
✓ PassedNo issues found. Passed automated security review. · v0.1.0 How review works →
- ✓ Prompt-injection patterns
- ✓ Secret / credential exfiltration
- ✓ Dangerous shell & filesystem operations
- ✓ Untrusted network calls
- ✓ Known-malicious package signatures
What it can access
- ✓ Network access No
- ✓ Filesystem access No
- ✓ Shell / process execution No
- ✓ Environment & secrets No
- ✓ Dynamic code execution No
From automated source analysis of v0.1.0. “Used” means the capability is present in the source — more access means more to trust, not that it’s unsafe.
Verified badge
Passed review? Show it. Paste this badge into your README, it links to the public security report.
Reliability & compatibility
Declared compatibility
Compatibility is declared by the source manifest. End-to-end runtime verification is coming, see below.
We're building live execution health for every listing: tool-call success rate, median latency, uptime, and last-checked timestamps, measured, not self-reported. It isn't live yet, so we don't show numbers we can't stand behind.
How agent discovery & health will work →About
/estimate — Task Estimation
Delegate to: producer (with lead-programmer for tech estimates)
Steps
1. Gather Context
Ask: "What task / feature do you want to estimate?"
2. Break Down Into Sub-Tasks
For a typical feature, list:
- Design: GDD writing (0.5-2 days)
- Implementation: Code writing (1-10 days depending on scope)
- Art assets: If needed (varies wildly)
- Integration: Hooking into existing systems (0.5-2 days)
- Testing: QA plan + execution (0.5-2 days)
- Polish: Rough edges, edge cases (0.5-1 day)
- Review: Code review, design review (0.5 day)
3. Estimate Each Sub-Task
Use T-shirt sizing for unclear items, hours for clear items:
- XS: 40% of sprint capacity (single task dominating the sprint)
- Flag if total breakdown doesn't match vague intuition
6. Present Estimate
# Estimate: [Feature Name]
## Sub-tasks
| Task | Size | Hours (est) | Risk |
|------|------|-------------|------|
| Design GDD | S | 6 | Low |
| Implement core | M | 16 | Medium |
| Implement UI | S | 8 | Low |
| Test + polish | S | 6 | Low |
| Review + iterate | S | 4 | Low |
**Subtotal**: 40 hours
**Contingency** (30%): 12 hours
**Total estimate**: ~52 hours (~6.5 working days)
## Risks
1. [Risk 1 — how it affects estimate]
2. [Risk 2]
## Assumptions
- [Assumption 1]
- [Assumption 2]
## Dependencies
- [Other tasks/systems this depends on]
Output
Present estimate to user. If too large, suggest splitting the feature. Save estimates to production/sprints/estimates/ when approved.
Source & license
This open-source skill is cataloged on AgentStack and links to its original source — we do not rehost the code.
- Author: CodePhobiia
- Source: CodePhobiia/claude-roblox-game-studio
- License: MIT
Install and usage instructions live in the source repository linked above.
Reviews
No reviews yet, be the first.
Write a review
Versions
- v0.1.0 Imported from the upstream source.